Similar Projects
IH 41 - IH 43 Const / Resurf Mill / Overlay
Infrastructure
Conception
$15,000,000 CJ est. value
Ashwaubenon, WI 54304

IH 41 - IH 43 Const / Resurf Mill / Overlay
Infrastructure
Conception
$15,000,000 CJ est. value
Ashwaubenon, WI 54304

2022 Sidewalk & Parking Lot Improvements
Infrastructure
Design
$805,551 CJ est. value
Ashwaubenon, WI 54304

2022 Sidewalk & Parking Lot Improvements
Infrastructure
Design
$805,551 CJ est. value
Ashwaubenon, WI 54304

2022 Fourth Avenue Utility and Street Reconstruction
Infrastructure
Bidding
$685,000 CJ est. value
Pulaski, WI 54162

2022 Fourth Avenue Utility and Street Reconstruction
Infrastructure
Bidding
$685,000 CJ est. value
Pulaski, WI 54162

Private Water Service Line Containing Lead Replacement
Term Contract
Post-Bid
Green Bay, WI

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

HMA Paving
Results
Howard, WI

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Shawano - Green Bay Constr Ops / Misc Fencing
Infrastructure
Design
$2,000,000 CJ est. value
Green Bay, WI 54301

Culvert Replacement and Road Repair
Infrastructure
Bidding
$150,000 CJ est. value
Green Bay, WI 54301

Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

Last Updated 08/24/2022 01:01 PM
Project Title

Sewers 1-22 Basin Repairs

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54301   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,086,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes approximately 1,880 linear feet of 8", 10", and 12" sanitary sewer relay including sanitary sewer reconnections, sanitary spot repairs, 30 linear feet of sanitary sewer abandonment, sanitary manhole construction, replacement, and reconstruction, 4,390 linear feet of 8", 10", and 12" CIPP lining, storm spot repair, and concrete and asphalt pavement reconstruction. The work shall be let in accordance with the following Sections of the Wisconsin Statutes. 1. Section 62.15 regarding public works construction. 2. Section 779.15 regarding lien on contractors. 3. Section 66.0901(2) regarding proof of responsibility. All bidders shall provide proof of responsibility on the form furnished by the Director of Public Works and it shall be filed with the Director of Public Works not less than five (5) days prior to the time set for opening of bids. Said proof of responsibility shall not be valid if filed prior to one year of the date of opening bids. In accordance with Section 42-2 of the City of Green Bay Code of Ordinances, any corporation, firm, or individual violating Chapter 133.01 of the Wisconsin Statutes, or any subsequent amendment thereof, shall upon conviction thereof be thereby disqualified as a bidder on any City of Green Bay project for a period of three (3) years from the date of such conviction; however, nothing herein shall be interpreted to preclude such corporation, firm, or individual from completing any and all contracts he/she may already have with the City at the time of such conviction, nor shall this ordinance be applied retroactively to convictions occurring prior to the adoption and publication of this ordinance. This prohibition applies with like force to officers of convicted corporations, firms, or individuals who thereafter have business interest in new corporations or business enterprises of whatever kind or description. No bids shall be withdrawn after the opening of bids without the consent of the City of Green Bay, Wisconsin for a period of sixty (60) days after the scheduled time for closing bids. All proposals must be submitted via their electronic vBid online bid service provided for that purpose and issued to the specific bidder by the Director of Public Works together a bid bond equal to at least five (5) but not more than ten (10) percent of the bid payable to the City of Green Bay as a guarantee that if his/her bid is accepted, he/she will execute and file the contract and a performance bond in the amount of one hundred percent (100%) of the total bid within ten (10) days after the award of the contract. Only the Proposal Pages, Surety Bond, Affidavit of Compliance, Disclosure of Ownership and any Addenda issued shall be submitted. Only Proposals submitted by firms appearing on the City of Green Bay list of plan holders will be opened. In case the successful bidder shall fail to execute such contract and performance bond, the amount of the check or bid bond shall be forfeited to the City as liquidated damages. The City of Green Bay, Wisconsin reserves the right to reject any or all bids and to waive any informality in bidding.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents