Similar Projects
Lee Square
New Construction - 24,120 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

Pine Bay
New Construction - 314,568 SF
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33415

Tennis Court Maintenance Equipment, Supplies, and Installation
Bidding
Boca Raton, FL 33432

The Learning Experience
New Construction - 16,323 SF
Post-Bid
$1,425,000 est. value
Palm Beach Gardens, FL 33403

Basketball and Tennis Court Resurfacing
Post-Bid
Palm Beach Gardens, FL 33410

Foxtail Palm Park Improvements
Results
Less than $603,741 est. value
Palm Springs, FL 33461

Bert Bostrom Park Shade Structure and ADA Playground Improvements
Results
Lake Park, FL 33403

Atlantic Crossing Artwalk
New Construction - 1,500 SF
Construction
Less than $500,000 CJ est. value
Delray Beach, FL 33483

Development of the Former Ocean Breeze Golf Course
New Construction
Conception
Boca Raton, FL 33487

Construction of Heart and Soul Park
Post-Bid
West Palm Beach, FL

VRPB Veterans Park ADA Improvements
Results
Royal Palm Beach, FL 33411

Canyon District Park Phase 1
New Construction - 2,600 SF
Post-Bid
Boynton Beach, FL 33472

Tennis Center Management and Maintenance Services
Results
Lake Park, FL 33403

Wildflower Park and Silver Palm Park Renovation and Improvements
Post-Bid
Boca Raton, FL 33432

Jupiter Beach Park - Pavilion Refurbishment
Term Contract
Results
Jupiter, FL 33477

Reported 07/14/2020 08:00 AM
Project Title

South Olive Tennis Center

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33405   (Palm Beach County)
Category(s) Green Building, Heavy and Highway
Sub-Category(s) LEED Certified, Park/Playground
Contracting Method
Project Status Construction Commenced July 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site Preparation, tree relocation, demolition of the Public Restroom and Locker building along with miscellaneous site demolition, clearing and preparation, as described in the Contract Documents. Construction of a new Tennis Center building, a new Locker & Restroom Building, along with installation of sidewalks, paver walkways, landscaping, fencing, lighting and utility work

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents