Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Replace Approach Slabs, Place HMA, Place Polyester Concrete Overlay
Infrastructure
Bidding
$3,980,000 est. value
CA

2022 Pavement Rehabilitation Project
Infrastructure
Bidding
$1,500,000 est. value
Fremont, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

2021 Pavement Project
Infrastructure
Bidding
Piedmont, CA

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

Citywide Pavement Rehabilitation 2021
Infrastructure
Results
$13,486,600 est. value
Oakland, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Citywide Pavement Rehabilitation
Infrastructure
Results
$13,486,600 est. value
Oakland, CA

Costco Road Improvement
Infrastructure
Post-Bid
$7,700,000 to $19,700,000 est. value
Pleasanton, CA 94588

Citywide Pavement Rehabilitation 2021
Infrastructure
Results
$5,072,530 est. value
Oakland, CA

Construction of the Johnson Drive Economic Development Zone Transportation Improvements
Infrastructure
Post-Bid
Pleasanton, CA 94588

Last Updated 02/24/2022 07:23 AM
Project Title

Annual Curb and Gutter for Street Resurfacing

Physical Address View project details and contacts
City, State (County) Pleasanton, CA   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $625,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project replaces concrete in preparation for the City’s annual resurfacing programs and will consist of, but is not limited to, 60 pedestrian ramps, 3,604 square feet of sidewalk and driveways, 1,349 linear feet of curb and gutter, a sidewalk bulb out, installation of 53 glue down ADA domes and grinding the curb lip flush and associated work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents