Similar Projects
Phillips Boiler Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Salt Lake City, UT 84111

Decker Lake Youth Center HVAC Controls Upgrade
Renovation
Sub-Bidding
$112,000 CJ est. value
West Valley City, UT 84119

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

Chiller Replacement Jefferson Jr. High School
Results
Kearns, UT 84118

Health Science Campus High Temp Water Line Removal
Results
$1,140,000 est. value
Salt Lake City, UT 84112

Provide and Install New Booster Heater - Dilworth Elementary
Renovation
Sub-Bidding
$200,000 CJ est. value
Salt Lake City, UT 84111

Salt Lake City ATCT CRAC Unit Upgrades
Term Contract
Post-Bid
Salt Lake City, UT

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

DFCM Construction Pre-Qualified Mechanical - Cannon Health Building 4th Floor CRAC Unit Replacement Department Of Health & Human Services
Renovation
Sub-Bidding
$100,000 CJ est. value
Salt Lake City, UT 84116

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

Air Terminal Upgrade
Alteration
Results
UT

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

Jewelry Room Ventilation
Term Contract
Results
Herriman, UT 84096

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

Last Updated 11/15/2022 03:34 AM
Project Title

U Hospital - Air Handling Unit 16 Decommissioning

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84132   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $61,840 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

70422 Bids will be in accordance with the Contract Documents prepared by the University of Utah Planning, Design & Construction and U Facilities hereinafter referred to as "A/E" as defined in the General Conditions. Scope of Work : Bid Phase 1 only / Sheets MD104, M104, Electrical will be In-House, Provide Controls using Atkinson Electronics Effective September 10, 2018, the University has retired the previous state-mandated Surety Bond Forms and is now requiring the use of the AIA Bid Bond Form A310-2010 and Performance and Payment Bond Form A312-2010. All Questions Must Be POSTED to portal. Persons or companies bidding on this project shall hold a current Utah Contractor's License covering the type of work to be done and shall be bondable to the amount of the Contract. A representative from each interested prime firm is required to attend. During the meeting, a presentation will be made to describe the overall scope of work and the intended schedule. Interested firms may ask questions and request clarification about the project and the procurement process. Sub consultants are invited to attend this meeting but it is not mandatory for them. THE PRIME FIRMS ABSENCE FROM THE PRE-SUBMITTAL MEETING AND/OR FAILURE TO SIGN THE ATTENDANCE ROSTER PRECLUDES PARTICIPATION AS A SUBMITTING FIRM ON THIS PROJECT . A bid bond in the amount of five percent (5%) of the bid amount, made payable to The University of Utah, must be procured and submitted to the University of Utah within 24 hours after the bid due time. The bid bond may be scanned and submitted with the portal at the time of the bid. The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. Q & A deadline: Oct 24, 2022 4:00:00 PM MDT

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents