Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Gateway Mixed Use Development
New Construction - 526,026 SF
Design
$10,000,000 CJ est. value
Minneapolis, MN 55401

Seven Points Uptown
New Construction, Infrastructure, Renovation - 172,000 SF
Design
$150,000,000 CJ est. value
Minneapolis, MN 55408

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Lions Central Park Splash Pad
New Construction
Post-Bid
Rogers, MN 55374

Bde Maka Ska Park Pavilion/Refectory
New Construction
Results
Minneapolis, MN 55408

2021 Rogers High School Artificial Field Turf and Track Replacement
Results
$1,925,000 est. value
Rogers, MN 55374

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Juxtaposition Arts Center
New Construction, Renovation - 15,572 SF
Construction
$14,000,000 est. value
Minneapolis, MN 55411

Dayton's Building Conversion
Renovation - 45,000 SF
Pending Verification
$350,000,000 est. value
Minneapolis, MN 55402

Nicollet Avenue Apartments
New Construction
Pending Verification
Minneapolis, MN 55408

Scannell Properties Office and Warehouse
New Construction - 305,000 SF
Conception
$10,000,000 CJ est. value
Maple Grove, MN 55369

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Last Updated 12/22/2022 12:03 PM
Project Title

Riversedge - Phase 3

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55411   (Hennepin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Maintenance, Office, Park/Playground, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $288,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 includes the construction of small tower creating 250-350 apartments, along with a larger tower housing a 150-250 room luxury hotel and 80-150 condos. It would also see Phase 1 of the land bridge known as "The Lid" over the railroad and Shepard Road. Phase 2 includes the construction of a 12-20 story office tower, extension of "The Lid" around the tower, and extension of St. Peter Street to the river esplanade. Phase 3 includes the construction of a 24-36 story office tower, additional public realm space, a connection to Market Street and Upper Landing, and finishing the esplanade to connect Market and St. Peter Streets. The scope of each phase is under review as the market needs have shifted post-COVID-19. The developer will be serving as the general contractor. An architect has been selected. Information regarding subcontractor bidding opportunities has not been released. A construction schedule has not been determined for Phase 3.* *Riversedge is a $788 million redevelopment of the Minneapolis riverfront.

Details

36 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents