Similar Projects
Downtown Improvements Phase 1 and Phase 2
Infrastructure
Bidding
New Haven, MO

Indian Creek Trail Improvements
Infrastructure
Bidding
Kansas City, MO 64114

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

2021 Sidewalk Replacements
Post-Bid
Saint Joseph, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

4th Street and Broadway Pedestrian Crossing
Infrastructure
Bidding
Columbia, MO 65299

Repair Building Exterior-Troop B Headquarters and Crime Lab
Infrastructure, Alteration
Post-Bid
Macon, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

2022 New and Removal and Replacement of Concrete Curb and Gutter and Sidewalk
Infrastructure
Bidding
Farmington, MO

Seal and Restripe the Asphalt Parking Lots
Infrastructure
Post-Bid
Lathrop, MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

Last Updated 02/21/2022 06:57 AM
Project Title

ADA Improvement

Physical Address View project details and contacts
City, State (County) MO   (Webster County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J7P3101B Route Various WEBSTER County. ADA improvement at various locations in Webster County, the total length of improvement being 6.74 miles. (2): Job J7S3367B Route 38 WEBSTER County. ADA improvement from Banning Street to east of Blair Street in Marshfield, the total length of improvement being 0.709 miles. (3): Job J7S3439 Route Various WEBSTER County. ADA improvement at various locations in Marshfield, the total length of improvement being 0.3083 miles.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents