Similar Projects
Take 5 Oil Change
New Construction - 1,432 SF
Conception
Less than $500,000 CJ est. value
Henderson, NV 89015

West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

Ashley Furniture Industrial Facility
New Construction, Infrastructure - 298,389 SF
Design
$32,000,000 CJ est. value
Las Vegas, NV 89148

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

Cactus Avenue, Las Vegas Boulevard to Spencer Street
Infrastructure
Results
$8,894,898 CJ est. value
Enterprise, NV 89141

Sunset Park Tennis Courts Replacements
Infrastructure
Results
$3,188,500 CJ est. value
Las Vegas, NV 89120

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Speedee Mart
New Construction - 5,350 SF
Construction
$995,000 est. value
Henderson, NV 89044

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Aspire at Sunset
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Henderson, NV 89014

Maverik #660
New Construction - 5,951 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89115

Last Updated 06/27/2023 05:10 PM
Project Title

Hydrogen Fueling at Sunset Maintenance Facility -Trucked in Liquified

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89118   (Clark County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $19,047,367 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to complete mobile fueling system to support the operation of up to 15 hydrogen fuel cell electric buses at the Sunset Maintenance Facility (SMF). The mobile fueling system is intended to be used as an interim method of fueling fuel cell electric buses during the design and construction of a larger and permanent hydrogen fueling system. The permanent-facility project will be bid under a separate scope/contract. The mobile fueling system is expected to dispense hydrogen (delivered under a separate procurement) via compression of gaseous hydrogen supplied to the facility via 'drop and swap' tube trailers to the hydrogen fuel cell electric buses or by pumping and gasifying cryogenic-liquid hydrogen. The supplier for this scope of work shall provide all of the physical infrastructure required for the mobile fueling system to operat Question Cuttoff Date & Time 6/14/2023 06:00:00 PM (ET)

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents