Similar Projects
Heating, Ventilation and Air Conditioning (HVAC) Multiple Award Construction Contract (MACC)
Term Contract
Post-Bid
$2,000 to $4,500,000 est. value
Homestead, FL 33039

Kendall Campus - Building 3000 AHU Replacement Package - South Quadrant
Alteration
Post-Bid
Miami, FL 33176

JL King Ductwork Cleaning Project
Results
Miami, FL 33132

J041--Chiller & Cooling Tower Plant Maintenance & Service
Results
Miami, FL 33136

Kendall Campus Building L Chiller Replacement
Renovation
Pending Verification
$500,000 CJ est. value
Miami, FL 33176

MDC Medical Campus Building 1000 AHU Replacement - Phase 4
Renovation, Alteration
Post-Bid
Miami, FL 33127

HVAC Preventative Maintenance Florida
Results
Key West, Miami, FL 33165

MDC Kendall Campus Building L - Chiller and Cooling Tower Replacement
Alteration
Post-Bid
Miami, FL 33176

Replace Desiccant Wheel Dehumidifier System
Term Contract
Results
Homestead, FL 33034

Miscellaneous Construction Contract (Mcc)
Renovation, Alteration
Post-Bid
$47,568 est. value
Miami, FL 33136

Weatherization Assistance Program - HVAC and Mechanical
Alteration
Results
$31,415 est. value
Miami, FL 33150

Miscellaneous Construction Contract
Alteration
Post-Bid
$23,338 est. value
Miami, FL 33136

HVAC Equipment Maintenance, Repair, Installation, and Replace Services-Various Locations North Region
Alteration
Results

Heating, Ventilation and Air Conditioning Replacement - North Region
Alteration
Post-Bid

Town Hall HVAC Replacement
Alteration
Results
Miami Lakes, FL 33014

Last Updated 01/26/2023 03:35 PM
Project Title

Norman and Jean Park- Gas Pool Heater Replacement

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33015   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $65,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Performance & Payment Bond Required: NO Bid Bond Required: NO Prevailing Wage Rate Required: N/A Davis Bacon: NO Maintenance Wages: NO AIPP: NO SBE-Con. Requirements: NO Percentage: 0.00% SBD Certificate of Assurance Form Required: NO DBE Participation: NO Percentage: 0.00% DBE Subcontractor Forms Required: NO CWP Requirements: NO Percentage: 0.00% SBE-S Requirements NO Percentage: 0.00% SBE-G Requirements NO Percentage: 0.00% Liquidated Damages: YES $$ Per Day: $250.00 Trade Set-a-side: NO If Yes, Trade = For RPQ's less than $10,000, if no LD rate is specified, the County reserves the right to assess actual damages in lieu of LDs. Design Drawing Included: NO Shop Drawing Included: NO Specifications Included: YES If you have any questions, contact Jose Lopez Jr at 786/315-2124 Site Meeting: YES Mandatory: YES Date: 11/29/2022 Time: 10:30 AM Location: Firm must visit locations prior to bid submittal Completion Date: 120 Calendar Days.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents