Last Updated 02/13/2019 02:16 AM
Project Title

FDP; PMST; Surface D

Physical Address View project details and contacts
City, State (County) SC   (Greenwood County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 450.000 Sy Borrow Excavation 214.000 Cy Maintenance Stone 61.300 Ton Liquid Asphalt Binder Pg64-22 19.297 Ton Full Depth Asph. Pav. Patching 4" Unif. 1,795.000 Sy Full Depth Asph. Pav. Patching 6" Unif. 900.000 Sy Full Depth Asph. Pav. Patching 8" Unif 3,435.000 Sy Milled-In Rumble Strip 1.940 Mi Hot Mix Asphalt Surface Course Type d 299.667 Ton Preventative Maintenance Surface Treatment 127,376.000 Sy Driveway Paving-Surface Type d 6.625 Ton Permanent Construction Signs (Ground Mounted) 3,556.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 25,130.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 25,664.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 17,513.000 Lf 12" White Solid Lines - Fast Dry Paint 1,290.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 5,739.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 151.000 Ea White Word Message "Only"-Fast Dry Paint 35.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 5,360.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 142,662.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 160.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 8,710.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 12,176.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 5,910.000 Lf 12" White Solid Lines - Thermo. - 125 Mil. 430.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,941.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 51.000 Ea Description Quantity Units White Word Message "Only" -Thermoplastic - 125 Mil. 12.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 1,880.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 53,782.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 80.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 709.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 268.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 927.000 Ea Detectable Warning Material 225.000 Sf Pedestrian Ramp Construction 450.000 Sy Surface Applied Detectable Warning 50.000 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 0.960 Acre
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents