Similar Projects
Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

Fort Thompson Dental & Optometry Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Thompson, SD 57339

Pavement Restoration on US12 East of Aberdeen
Infrastructure
Bidding
$800,000 CJ est. value
Bath, SD 57427

Road Maintenance
Term Contract
Post-Bid
SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$5,040,000 CJ est. value
Tyndall, SD 57066

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
Chamberlain, SD 57325

2022 Gravel, Road Blading, Snow Removal, and Road Mowing
Term Contract
Post-Bid
SD

Last Updated 03/20/2023 03:05 AM
Project Title

Approach Grading, AC Resurfacing

Physical Address View project details and contacts
City, State (County) Selby, SD 57472   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $828,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US12 - E Side of Missouri Rv Bridge Length 0.0 As of March 20, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Approach Grading, AC Resurfacing *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents