Similar Projects
Dallas North Tollway at IH-635 Bridge Box Beam Cap Repair
Renovation
Bidding
$500,000 to $1,000,000 est. value
Farmers Branch, TX

West Lawther Drive Over Rush Creek, Bridge Replacement
Post-Bid
Dallas, TX 75201

Bridge Project
Post-Bid
Bellville, TX 77418

Replace Bridge and approaches
Results
Less than $8,045,316 est. value
TX

Converse Greenway Trail Phase 1
Results
Converse, TX 78109

Bridge
Post-Bid
Gatesville, TX 76528

Bridge Preventative Maintenance
Results
Less than $241,331 est. value
TX

Oil Dock 6 West Pipe Bridge
Post-Bid
Brownsville, TX 78526

Rector Road Bridge Replacement
Results
$249,244 est. value
Denton, TX 76201

Installation of Thrie-Beam Retrofit Rail
New Construction
Post-Bid
College Station, TX

Second Avenue Over White Rock Creek Bridge Repair (PB17VA31)
Results
Dallas, TX

Brazos County Bridge Repair
Post-Bid
Bryan, TX

Meridiana Parkway Bridge, Phase Seven (Formally Mccoy Parkway Phase 1A P-2404)
Results
TX

Tornillo Guadalupe International Bridge (TGIB) Sidewalk Repair Project
Post-Bid
El Paso, TX

Replace Bridge and Approaches
Results
Less than $1,469,680 est. value
TX

Last Updated 05/07/2021 03:10 AM
Project Title

FM 83 - Bridge Maintenance

Physical Address View project details and contacts
City, State (County) TX   (Sabine County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $946,926
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

132 6003 Embankment (Final)(Ord Comp)(Ty B) Cy 75.000 1 162 6002 Block Sodding Sy 1,050.000 2 168 6001 Vegetative Watering Mg 21.000 3 400 6005 Cem Stabil Bkfl Cy 16.000 4 401 6001 Flowable Backfill Cy 5.000 5 422 6015 Approach Slab Cy 75.800 6 427 6006 Epoxy Waterproof Finish Sf 720.000 7 429 6007 Conc Str Repair (Vertical & Overhead) Sf 210.000 8 429 6018 Conc Str Rep (Remove and Repl Bm End) Cy 0.400 9 429 6023 Conc Str Repair (Pan Girder Hole Repr) Ea 112.000 10 432 6002 Riprap (Conc)(5 in) Cy 3.000 11 432 6033 Riprap (Stone Protection)(18 in) Cy 320.000 12 438 6001 Cleaning and Sealing Existing Joints Lf 455.000 13 438 6002 Cleaning and Sealing Exist Joints(Cl3) Lf 88.000 14 438 6010 Resizing and Sealing Joints Lf 237.000 15 439 6013 Multi-layer Polymer Overlay Sy 1,179.000 16 446 6023 Clean & Paint Exist Piling (System I-b) Ls 1.000 17 451 6004 Retrofit Rail (Ty T131rc) Lf 187.000 18 483 6013 Shot Blasting Sy 1,179.000 19 495 6001 Raising Exist Struct Ls 1.000 20 496 6025 Remov Str (Approach Slab) Ea 2.000 21 500 6001 Mobilization Ls 1.000 22 502 6001 Barricades, Signs and Traffic Handling Mo 11.000 23 506 6020 Construction Exits (Install) (Ty 1) Sy 468.000 24 506 6024 Construction Exits (Remove) Sy 468.000 25 506 6038 Temp Sedmt Cont Fence (Install) Lf 900.000 26 506 6039 Temp Sedmt Cont Fence (Remove) Lf 900.000 27 512 6089 Ptb(Frn&instl)(Sscb or Csb)(Ty1)or(Stl) Lf 370.000 28 512 6090 Ptb(Move)(Sscb or Csb)(Ty1)or(Stl) Lf 370.000 29 512 6091 Ptb(Remove)(Sscb or Csb)(Ty1)or(Stl) Lf 370.000 30 540 6001 Mtl W-beam Gd Fen (Tim Post) Lf 1,750.000 31 540 6006 Mtl Beam Gd Fen Trans (Thrie-beam) Ea 12.000 32 542 6001 Remove Metal Beam Guard Fence Lf 800.000 33 542 6002 Remove Terminal Anchor Section Ea 8.000 34 544 6001 Guardrail End Treatment (Install) Ea 8.000 35 545 6003 Crash Cush Atten (Move & Reset) Ea 4.000 36 545 6005 Crash Cush Atten (Remove) Ea 4.000 37 545 6019 Crash Cush Atten (Instl)(S)(N)(Tl3) Ea 4.000 38 658 6014 Instl Del Assm (D-sw)sz (Brf)ctb (Bi) Ea 4.000 39 658 6016 Instl Del Assm (D-sw)sz (Brf)gf1 (Bi) Ea 11.000 40 662 6057 Wk Zn Pav Mrk Remov (Traf Btn) Ty W Lf 3,200.000 41 662 6059 Wk Zn Pav Mrk Remov (Traf Btn) Ty Y Lf 3,200.000 42 662 6075 Wk Zn Pav Mrk Remov (W)24"(Sld) Lf 96.000 43 662 6109 Wk Zn Pav Mrk Sht Term (Tab)ty W Ea 68.000 44 662 6110 Wk Zn Pav Mrk Sht Term (Tab)ty Y Ea 68.000 45 666 6170 Refl Pav Mrk Ty Ii (W) 4" (Sld) Lf 570.000 46 666 6207 Refl Pav Mrk Ty Ii (Y) 4" (Sld) Lf 70.000 47 666 6224 Pavement Sealer 4" Lf 640.000 48 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 4.000 49 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 96.000 50 678 6001 Pav Surf Prep for Mrk (4") Lf 640.000 51 712 6017 Jt / Crck Rout / Seal(Rubber - Asphalt) Lf 37.000 52 778 6075 Conc Rail Repair(Remove and Repl Rail) Lf 32.800 53 3076 6003 D-gr Hma Ty-b Pg64-22 (Exempt) Ton 847.000 54 6001 6002 Portable Changeable Message Sign Ea 4.000 55 6185 6002 Tma (Stationary) Day 34.000 56 6185 6005 Tma (Mobile Operation) Day 2.000 57

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents