Similar Projects
Painting Exterior of Building 12 East Wing (HS)
Alteration
Results
$100,000 est. value
Hot Springs, SD

Water Storage Coating Improvements
Results
Sisseton, SD

4H Livestock Complex Structure Repairs and Painting
Renovation, Alteration
Results
$100,000 est. value
Huron, SD 57350

Interior and Exterior Painting Services
Term Contract
Results
Sioux Falls, SD

Beadle School Painting
Alteration
Post-Bid
Yankton, SD 57078

Surface Preparation and Painting Water Basin 6
Alteration
Post-Bid
Sioux Falls, SD 57104

Painting in Stewart School
Post-Bid
Yankton, SD 57078

Painting, Wallcovering & Plaster Repair
Alteration
Post-Bid
SD

Painting Project
Post-Bid
Mission, SD

Bridge Rail Painting
Alteration
Post-Bid
SD

Painting Services
Alteration
Post-Bid
Rosebud, SD

Painting Services
Alteration
Post-Bid
Spearfish, SD 57783

Reported 06/14/2022 12:00 AM
Project Title

Painting the Elementary School Classroom Hallways

Physical Address View project details and contacts
City, State (County) North Sioux City, SD 57049   (Union County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $460,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Dakota Valley School District #61-8 is accepting sealed bids for painting the elementary school classroom hallways. The total square footage is approximately 17,000 square feet. There are lockers in some of the hallways that do not get painted. Bidder must provide specified paint. The main portion of the walls will be Sherwin Williams 7014 Eider White, eight hallways each with their own color stripe, sixteen inches wide. Those colors are as follows, all Sherwin Williams. Invigorate 6886 (orange), Decisive 6902 (yellow), Poinsettia 6594 (red), Greenbelt 6927(green),African Violet 6982, Blueblood 6966. Dakota Valley School District will keep all excess paint not used. Project must be completed by August 5, 2022.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents