Similar Projects
Cosmetology Building Sewer Service Replacement
Infrastructure
Bidding
$50,000 est. value
Wilkesboro, NC 28697

Three Phase Pump for Commons P.S.
Post-Bid
Jacksonville, NC

Water Well Drill
Post-Bid
Willow Spring, NC 27592

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

Construction of 2 New Water Supply Wells Serving
Results
Less than $392,000 est. value
Wallace, NC 28466

Vacuum Turbo Pump
Post-Bid
Raleigh, NC

Pendergrass Chlorine Booster Pump System
Results
Sanford, NC 27330

Tsurumi Pumps Submersible
Post-Bid
Wilmington, NC

Repair, Overhaul, and Rebuild of Stokes Mechanical Pump
Results
Cherry Point, NC

Annual Standby Emergency Pumping Contract
Term Contract
Post-Bid
Pine Knoll Shores, NC

Well 46 And 47 Improvements
Results
$1,192,000 to $1,196,000 est. value
Wilmington, NC

Hymax Grip Elbow
Term Contract
Post-Bid
Jacksonville, NC

Skid Pump Package
Results
Boone, NC

Fairbanks Morse Pump
Infrastructure
Post-Bid
Jacksonville, NC

Freemason Well Rehabilitation
Results
Edenton, NC 27932

Last Updated 05/10/2022 03:05 AM
Project Title

Overhaul Archimedes Screw Pumps FC440

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC   (Onslow County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The system shall meet the following requirements: a- System shall be an open screw pump consisting of a spiral screw, upper and lower bearings and a drive assembly. b- Screw pumps shall be place in a steel trough at an angle of inclination ranging from 30 degrees with a hydraulic lift of 40 feet. c- Screw pumps sealed lower bearing shall be designed with a long lasting sleeve bearing and integrated grease lubricating system or a permanently greased lubricated roller bearing. d- Bearing assemblies must be design for continuous operation in both submerged and non-submerged conditions. e- System shall be non-clogging with no pre-screening required. f- System shall be designed and rated for use as an intermediate lifting pump in waste-water treatment plant operations/conditions. g- Footprint of system and connection points must match existing anchor bolt configuration of system at MCB Camp Lejeune’s wastewater treatment plant. h- System must have efficiency rating of up to 75% efficient. i- System shall be designed for lifting of return sludge from clarifier back to the aeration basing in active sludge treatment cycle, requiring a gentle lift to reduce the break-up of fragile activated sludge floc particles.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents