Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

The Peninsula Wellness Community
New Construction, Infrastructure - 100,000 SF
Design
$216,000,000 CJ est. value
Burlingame, CA 94010

Tunitas Creek Beach Improvements
Infrastructure, Renovation
Bidding
$11,000,000 CJ est. value
Half Moon Bay, CA 94019

El Camino Real Apartments
New Construction, Infrastructure
Sub-Bidding
$52,000,000 CJ est. value
San Bruno, CA 94066

RFP Engineering - Redwood Shores Isolation Valve Installation Project
Infrastructure
Post-Bid
$175,000 CJ est. value
Redwood City, CA 94063

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Southline Office and Lab Development
New Construction, Infrastructure - 2,659,000 SF
Construction
$426,000,000 CJ est. value
South San Francisco, CA 94080

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

222 Gateway Terrace Condominiums
Demolition, New Construction, Infrastructure - 54,445 SF
Pending Verification
$15,000,000 CJ est. value
San Mateo, CA 94401

Install New Amphitheater Shade Structure - PK-04 - City of Foster City
Infrastructure
Conception
$900,000 CJ est. value
Foster City, CA 94404

Last Updated 05/12/2023 11:04 AM
Project Title

RFQ for Design-Build Services - Final Effluent Pump Station Improvements Project

Physical Address View project details and contacts
City, State (County) Redwood City, CA 94063   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Request for Qualifications, Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 12, 2023, final selection date will be taking place on July 14, 2023 and anticipated commission approval on September 11, 2023. Final Effluent Pump Station Improvements Project complete construction of the project before May 30, 2026. The SVCW WWTP is located at 1400 Radio Road, at the east end of Redwood Shores, in Redwood City, California. The Project consists of improvements to the final effluent Pump Station and related appurtenances . The Final Effluent Pump Station Improvements Progressive Design-Build Project includes the following elements: 1. Suction piping and valves from final effluent wet pit to pumps 2. Final effluent pumps and motors 3. Discharge piping and motorized valves from pumps to the final effluent header pipe 4. 66-inch welded steel final effluent header section of the pipe that is encased in concrete Approximately 75 feet 5. Variable Frequency Drives (VFDs) 6. Breakers at the Motor Control Center (MCC) 7. Power, control, and instrumentation conductors 8. Related PLC, controls, and data acquisition hardware 9. Sodium Bisulfite injection system Total construction costs are expected to be about $7 million.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents