Similar Projects
Mill & Fill with Drainage, Traffic Signals and other Safety Improvements
Infrastructure
Bidding
$2,800,000 est. value
Lancaster, NY 14086

Hulbert Library - Parking Lot Paving
Infrastructure
Bidding
$300,000 est. value
Springville, NY 14141

Intersection Safety Improvements Main/Kensington/Humboldt and Bailey/Delavan
Post-Bid
Buffalo, NY 14269

Highway Summer Maintenance Part 1 and Part 2
Term Contract
Post-Bid
NY

Airport Pavement Maintenance 2021
Results
Less than $1,300,000 est. value
Cheektowaga, NY 14225

Young Street Corridor Improvements
Results
Less than $2,325,865 est. value
Tonawanda, NY

Resurfacing of Various Streets 2021-2023
Term Contract, Infrastructure
Post-Bid
Mount Vernon, NY

Pavement Maintenance/ Improvements: 2.7 Miles of Roadway
Results
Less than $2,400,000 est. value
North Tonawanda, Tonawanda, NY

Cazenovia Park Parkway Improvements, Group 993A
Infrastructure
Post-Bid
Buffalo, NY

Highway Rehabilitation along I-290 including Guide Rail, Drainage and ADA Compliance Work in the Towns of Amherst and Tonawanda
Results
Amherst, Tonawanda, NY

2021 Milling and Paving Project of Various Village Roads
Infrastructure
Post-Bid
Williamsville, NY

Niagara Falls International Airport Airside Pavement Maintenance 2021
Results
$500,000 est. value
Buffalo, NY 14203

Regional Paving Multiple Award Task Order Contract (MATOC)
Alteration
Post-Bid
Chicago, IL - Louisville, KY - Detroit, MI - Buffalo, NY - Pittsburgh, PA - Nashville, TN - Huntington, WV

Citywide Mill and Overlay 2021
Results
Buffalo, NY

Village of Hamburg Healthy Neighborhood/Safe Routes to School II
Infrastructure
Post-Bid
Hamburg, NY

Reported 05/25/2022 12:00 AM
Project Title

Crack Sealing

Physical Address View project details and contacts
City, State (County) Buffalo, NY   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a road / highway in Buffalo, New York. Completed plans call for site work for a road / highway. This Division reserves the right to reject any and all bids and waive any informalities. The work in this section shall include work required for crack and joint sealing and filling for asphalt pavements. Clean and seal or fill only primary cracks along their entire length at locations shown in the contract documents or where directed by the Engineer. Do not treat secondary radial cracks. In this specification, the word crack also means joint. Primary cracks are defined as those greater than or equal to 1/8 inch and less than or equal to 1 inch wide

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents