Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Engineering and Environmental Services Open End
Infrastructure
Bidding

South Main Street Bridge Improvement Project
Infrastructure
Bidding

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

A&E IDIQ Northeast Area
Design
$1,000 to $45,000,000 est. value

Design, Engineering, Construction, and Technical Services for installation/relocation of Radiation Portal Monitors
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Z2da--693-20-109 Replace Underground Storage Tanks
Design
$1,000,000 to $5,000,000 est. value
Wilkes-Barre, PA 18702

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Corrosion Engineering Services
Results
$100,000 to $13,500,000 est. value

Indefinite Delivery/Indefinite Quantity (IDIQ) procurement to acquire Architect-Engineer (AE) Services under individual task orders throughout the Mobile District Area of Responsibility (AOR) to support Mobile District Planning and Environmental Division
Post-Bid

Reported 07/20/2021 12:00 AM
Project Title

Overfill Protection and Fuel Pump Replacement

Physical Address View project details and contacts
City, State (County) Avoca, PA 18641   (Luzerne County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Engineering, Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/07/21
Owner View project details and contacts
Architect View project details and contacts
Description

Performing Engineering/Design, Bid, and Construction Phase Services for "Overfill Protection and Fuel Pump Replacement (Aviation Fuel Farm)" project at the Wilkes Barre/Scranton International Airport.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents