Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

A Street South, Area 1 and 2 (topside) Phase 2
Infrastructure
Bidding
$300,000 est. value
Lathrop, CA 95330

COS MUD RWCF Bioscrubber Repairs
Infrastructure
Bidding
$650,000 est. value
CA 95206

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Brennan Avenue Resurfacing
Infrastructure
Results
$1,140,000 to $1,395,000 est. value
Escalon, CA

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

Tracy Various Paving
Term Contract, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Tracy, CA 95304

Road Diet On North Eldorado Street, Turn And Bike Lanes
Infrastructure
Results
Stockton, CA 95214

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Concrete Repairs and Resurfacing
Infrastructure
Results
Stockton, CA

SB Minor B Widen Existing Staa Curve Radius
Infrastructure
Post-Bid
$158,000 est. value
Stockton, CA

2021 Pavement Rehabilitation Program Project
Infrastructure
Results
$420,000 est. value
Stockton, CA 95207

Cold Plane and HMA Overlay
Infrastructure
Post-Bid
$3,380,000 est. value
CA

West Lane Resurfacing
Infrastructure
Results
Lodi, CA

Reported 07/11/2022 04:19 PM
Project Title

Operational Improvements

Physical Address View project details and contacts
City, State (County) Stockton, CA 95214   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $17,836,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Operational Improvements Project ID : 1018000159 Bkpm: 4.6 Ahpm : 5.3 Proposed Advertise Date : 05/07/2022 As of July 08, 2022, the project is in Final Planning status. Anticipated construction year is 2022. CADOT - Operational Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents