Similar Projects
Last Updated | 07/21/2023 05:07 PM |
Project Title | Newell Creek Pipeline Replacement - Felton/Graham Hill Project |
Physical Address | View project details and contacts |
City, State (County) | Santa Cruz, CA 95060 (Santa Cruz County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $31,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes replacing approximately 25,000 linear feet (LF) of existing 18- to 27-inch Concrete Cylinder Pipe and steel water transmission main from Felton Booster Pump Station (FBPS) 6000 East Zayante Road, Felton, CA 95018 to the Graham Hill Water Treatment Plant (GHWTP) 715 Graham Hill Road, Santa Cruz, CA 95060 with a new approximately 23,400 foot long, 24-inch diameter Ductile Iron (DI) pipeline to be located in Graham Hill Road. Additional work includes work in a protected waterway with drilled concrete piers, pipeline installation under existing railroad tracks, and a cathodic protection system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |