Similar Projects
New High School Facility
New Construction
Conception
Baton Rouge, LA 70873

St. Joseph's Academy Office and Parking
New Construction
Conception
Baton Rouge, LA 70873

Sullivan Road Mini-Storage
New Construction, Build-Out - 82,800 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70818

New Elementary School (Southern District) - East Baton Rouge Parish School System
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Baton Rouge, LA 70802

RFQ Construction Manager at Risk (CMAR) - St. Amant Primary and Middle Renovations and Additions
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Saint Amant, LA 70774

RFQ Construction Manager at Risk (CMAR) - St. Amant Primary and Middle Renovations and Additions
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Saint Amant, LA 70774

Mallard Golf Club Lake Charles Clubhouse and Pro Shop
New Construction
Post-Bid
Lake Charles, LA

Phase 33 - Improvements Classroom Addition to Existing Pod
Addition
Post-Bid
Lake Charles, LA

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

Hurricane Repairs for Calcasieu Parish School Board
Renovation
Results
Lake Charles, LA

Love's Travel Stop #858
New Construction - 12,295 SF
Construction
$1,000,000 to $5,000,000 est. value
Mansfield, LA 71052

Goss Financial
Build-Out - 11,470 SF
Construction
$1,000,000 to $5,000,000 est. value
Baton Rouge, LA 70809

Advanced Call Center Technologies
Renovation
Pending Verification
$1,500,000 est. value
Shreveport, LA 71106

New Era Electronic Medical Claims Processing Center
Build-Out
Pending Verification
Baton Rouge, LA 70806

Wemple Road Office Park
New Construction
Conception
$1,500,000 est. value
Bossier City, LA 71111

Last Updated 01/05/2023 12:31 PM
Project Title

Central Office Remodel Human Resources Department

Physical Address View project details and contacts
City, State (County) Shreveport, LA 71108   (Caddo County)
Category(s) Commercial, Education
Sub-Category(s) Elementary School, Middle/Senior High School, Office
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $382,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Central Office Remodel Human Resources Department BID SECURITY equal to five percent (5%) of the Total Bid shall be in the form of a bid bond, certified check or cashier's check as prescribed by LA RS 38:2218 must be attached to and made a part of the bid. If a bid bond is provided it shall be on the provided form and only on the provided form. Bid bonds must be written by a qualified company licensed to do business in Louisiana. The successful bidder will be required to furnish a Performance Bond written by a company licensed to do business in Louisiana in an amount equal to one hundred percent (100%) of the contract amount. For this project, Liquidated Damages will apply in the amount of Six Hundred and 00/100 ($600.00) per day for each consecutive calendar day which the work is not completed, beginning with the first day beyond the established completion date of 75 calendar days. No bid may be withdrawn for a period of forty-five (45) days after actual date of the opening thereof. The Board reserves the right to reject any and all bids. The Caddo Parish School Board desires that Bidders make a good faith effort to utilize 25% small and economically disadvantaged businesses Persons arriving after the meeting starts will not be allowed to submit a prime bid for the project. Attendance at the pre-bid conference by an officer, estimator or other individual knowledgeable with preparing the bid, is MANDATORY and will be considered a pre-condition for bidder eligibility. CADDO PARISH SCHOOL BOARD An Equal Opportunity Employer

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents