Similar Projects
2019 Bond - Clay County School District
New Construction, Renovation, Infrastructure
Conception
$318,000,000 CJ est. value
Orange Park, FL 32073

The Prelude
New Construction, Infrastructure - 11,525 SF
Design
$20,000,000 CJ est. value
Green Cove Springs, FL 32043

Governor's Park Water Treatment Plant (WTP) Supply Well Drilling
Infrastructure
Bidding
$400,000 CJ est. value
Middleburg, FL 32068

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Ridaught Water Treatment Plant (WTP) Ground Storage Tank (GST) Rehabilitation Project
Build-out, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Middleburg, FL 32068

Dolphin Street and Dolphin Court Utility Roadway Improvements
Results
$1,100,000 to $1,150,000 est. value
Orange Park, FL 32073

Cured-In-Place Pipe Services
Results
FL

CVS #3486
Renovation
Construction
$50,000 est. value
Orange Park, FL 32065

Bradley Creek Residences
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Green Cove Springs, FL 32043

Dollar Tree Plaza
New Construction, Infrastructure - 3,006 SF
Pending Verification
$800,000 CJ est. value
Green Cove Springs, FL 32043

Green Cove Springs Self Storage / Green Grove Springs
New Construction, Infrastructure - 84,463 SF
Post-Bid
$9,122,004 CJ est. value
Green Cove Springs, FL 32043

Fire and Water Main Expansion, Orange Park Campus
Infrastructure
Results
Orange Park, FL 32065

Brass Fittings
Infrastructure
Results
FL

CDBG 20 NR Water Main Replacement and Extensions
Infrastructure
Results
$523,000 est. value
Orange Park, FL

Eldridge Avenue Water Main Replacement Project
Infrastructure
Results
Orange Park, FL 32073

Last Updated 08/30/2022 02:32 PM
Project Title

Design and Permitting of the Black Creek Water Resource Development Project

Physical Address View project details and contacts
City, State (County) Keystone Heights, FL 32656   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $38,813,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, superintendence, materials, power, light, heat, fuel, tools, appliances, equipment, supplies, and other means of construction necessary or proper for performing and completing the work. The Contractor shall obtain and pay for all required permits. The Contractor shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer and District, and in strict accordance with the Contract Documents. The Contractor shall clean up the work and maintain it during and after construction, until accepted, and shall do all work and pay all costs incidental thereto. The Contractor shall repair or restore all structures and property that may be damaged or disturbed during performance of the work. Black Creek Water Resource Development Pipeline Construction Two Step Invitation for Bid The District also reserves the right to reject all Bids that are over the estimated range. The construction estimate range for this project and related work is $60,000,000 $74,000,000.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents