Similar Projects
Last Updated | 12/05/2018 12:19 PM |
Project Title | Boiler Plant - Temporary Generator Provisions |
Physical Address | View project details and contacts |
City, State (County) | Farmville, VA (Prince Edward County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of the electrical work associated with temporary generator provisions for the Boiler Plant at Longwood University in Farmville, VA. generally described as adding a manual transfer switch with a drawout circuit breaker on the normal side for a temporary generator for the Boiler Plant service, along with removing the existing 1600A main circuit breaker in the existing switchboard and reworking the switchboard bus bars so that the switchboard becomes a main-lugs-only switchboard. The Work also includes providing a conveniently-located tap box for a temporary generator connection and conductors from the new manual transfer switch to the tap-box. A ground rod(s) shall be provided for the generator grounding system. Also, the Work includes re-routing the two standby power feeders through the main switchboard serving the fuel oil pump skid and a step-down transformer. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |