Similar Projects
Last Updated 12/20/2019 07:06 AM
Project Title

Removal of Asphalt (Planing), SMA, Concrete Sidewalk, Concretecurb Ramp, Concrete Median Cover, Signing, Striping, and Traffic Control

Physical Address View project details and contacts
City, State (County) (Arapahoe, Denver Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SH 083a (Leetsdale): Mississippi to Colorado Boulevard. This resurfacing project includes Removal of Asphalt (Planing), SMA, Concrete sidewalk, Concrete Curb Ramp, Concrete Median Cover, Signing, Striping, and Traffic Control. 202-00200 Removal of Sidewalk 1,132.000 SY 202-00203 Removal of Curb and Gutter 1,854.000 LF 202-00240 Removal of Asphalt Mat (Planing) 93,833.000 SY 202-00250 Removal of Pavement Marking 15,400.000 SF 202-00828 Removal of Traffic Signal Equipment 1.000 L S 202-04005 Clean Valve Box 63.000 EACH 202-04010 Clean Inlet 49.000 EACH 208-00106 Sweeping (Sediment Removal) 120.000 HOUR 210-04010 Adjust Manhole 134.000 EACH 210-04050 Adjust Valve Box 126.000 EACH 212-00006 Seeding (Native) 0.010 ACRE 304-06000 Aggregate Base Course (Class 6) 100.000 TON 403-00720 Hot Mix Asphalt (Patching) (Asphalt) 412.000 TON 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 9,114.000 TON Major Items 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 2,000.000 TON 411-10255 Emulsified Asphalt (Slow-Setting) 4,691.000 GAL 503-00018 Drilled Shaft (18 Inch) 4.000 LF 608-00006 Concrete Sidewalk (6 Inch) 294.000 SY 608-00010 Concrete Curb Ramp 1,009.000 SY 609-21020 Curb and Gutter Type 2 (Section II-B) 657.000 LF 609-40031 Curb Type 4 (Section B) (Key-Way) 5,197.000 LF 610-00026 Median Cover Material (6 Inch Patterned Concrete) 20,210.000 SF 614-00216 Steel Sign Post (2x2 Inch Tubing) 384.000 LF 614-70150 Pedestrian Signal Face (16) (Countdown) 25.000 EACH 614-70336 Traffic Signal Face (12-12-12) 9.000 EACH 614-70448 Traffic Signal Face (12-12-12-12) 2.000 EACH 614-70560 Traffic Signal Face (12-12-12-12-12) 1.000 EACH 614-72863 Pedestrian Push Button Post Assembly 25.000 EACH 614-72886 Intersection Detection System (Camera) 4.000 EACH 620-00002 Field Office (Class 2) 1.000 EACH 620-00012 Field Laboratory (Class 2) 1.000 EACH 625-00001 Construction Surveying (Hourly) 100.000 HOUR 626-00000 Mobilization 1.000 L S 627-00008 Modified Epoxy Pavement Marking 184.000 GAL 627-00013 Pavement Marking Paint (High Build) 506.000 GAL 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 2,104.000 SF 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk- Stop Line) 5,662.000 SF 630-00000 Flagging 2,250.000 HOUR 630-00003 Uniformed Traffic Control 1,000.000 HOUR 630-00004 Traffic Control Vehicle 2.000 EACH 630-00012 Traffic Control Management 74.000 DAY 630-80355 Portable Message Sign Panel 4.000 EACH

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents