Similar Projects
Security Alarm
Bidding

Security Alarm
Bidding

Fire Alarm Service, Inspection and Testing 2021-24
Term Contract
Post-Bid
MN

USD Inspection of Water-Based Fire-Protection Systems
Term Contract
Post-Bid
MN

2020 Fire Alarm System Transition (P6)
Results
Saint Paul, MN 55111

District Wide Fire Protection
Renovation
Results
Bemidji, Minneapolis, MN 55407

MState/DL-20-Fire Alarm Replacement and Upgrade
Bidding
$452,164 est. value
Detroit Lakes, MN 56501

USD Fire Extinguisher Service 10162020
Term Contract
Post-Bid
MN

Red Lake Elementary Fire Sprinklers
Results
Red Lake, MN

Fire Alarm Upgrades Bid Packages 2021-A and 2022-A
Term Contract
Post-Bid
Rochester, MN 55904

Fire Extinguisher Inspections, Maintenance, and Services
Term Contract
Results
Minneapolis, MN

Fire Alarm Upgrades Bid Packages 2021-B and 2022-B
Term Contract
Post-Bid
Rochester, MN 55906

Fire Alarm Upgrades Bid Packages 2021-C and 2022-C
Term Contract
Post-Bid
Rochester, MN 55906

Rochester Public Schools Fire Alarm Upgrades
Term Contract
Post-Bid
$431,500 to $556,500 est. value
Rochester, MN

Fire Alarm Systems Inspection and Testing
Post-Bid
Minneapolis, MN

Reported 04/08/2021 12:00 AM
Project Title

Facility Safety Improvements - Phase B

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55487   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $365,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The main objective of this project is to design improvements for the overall life safety of the occupants of the facility. The scope of the Phase B project is as follows: All work associated with the corner mechanical shafts: • Provide and install masonry infill, penetration firestopping systems, and joint firestopping at all openings and penetrations in existing shaft walls as required to provide a fire barrier with 2-hour fire-resistance rating at walls of the four corner shafts. • Replace doors and door hardware to provide 1 ½-hour rated fire doors. • Provide and install fire/smoke dampers at ducts penetrating 2-hr fire-resistance rated shaft walls. • Infill floor openings and install guardrails to provide fall protection at openings in shaft floors.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents