Similar Projects
RFQ - Precast Concrete
Term Contract
Post-Bid
MT

Fort Benton Water Tank Replacement
New Construction, Infrastructure
Bidding
$560,000 CJ est. value
Fort Benton, MT 59442

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

2022 North 7th Avenue Water Renovations
Infrastructure
Design
$427,000 CJ est. value
Bozeman, MT 59715

St. Ignatius School District - Gym and Shop Addition
Addition, Demolition, Infrastructure - 3,517 SF
Post-Bid
$1,725,000 CJ est. value
Saint Ignatius, MT 59865

Bonner Mill Concrete Demolition and Backfill
Alteration
Results
$350,000 est. value
MT

Last Updated 08/22/2022 05:03 PM
Project Title

RFQ CM/GC - West End Reservoir Project

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Request Category Code: Concrete, Flowable Fill, Excavating Services, General Contractors - Construction, Design-Build, Installation of Water Pipelines, Civil, Construction Manager at Risk, Earthworks Operations, Water Resources Infrastructure, Piping, Pumps or pump stations, Bridges/Overpasses, Reservoir Construction (concrete), Culverts, Waterways, Stormwater Channels The West End Reservoir (WER) project consists of a raw water storage reservoir to be constructed in the former Knife River gravel pits north and south of Hesper Road between South 48th Street West and Shiloh Road on the west end of Billings. The completed project will supply the future West End Water Treatment Plant (WEWTP) with water from the Yellowstone River and provide a valuable recreational amenity to the community. The north reservoir cell is to have an approximate water surface area of 100 acres and depth of 21 feet. The surface elevation of the south cell is to be 10 feet lower than the north cell, 60 acres in size and 20 feet deep. Inlet and outlet structures and spillways will be built for both reservoir cells. A screened, multi-level fixed intake structure will allow water to flow from the WER to the WEWTP directly by gravity or via a wetwell/pump station located outside the WER embankment when pumping the reservoir to the lower levels is desired. Pretreatment sedimentation basins up gradient of the reservoirs will also be built with the project. Other project components may include: o Hesper Road reconstruction and a bridge or other structure to accommodate and outlet works from the north cell to the south cell, and o reservoir access features such as piers, boat ramps, and multi-purpose trails. SOQs received will be ranked by a selection committee using a scoring system based on defined criteria. Approximately three (3) Contractors having the highest ranked SOQs will be required to submit project proposals. The committee will select the final Contractor by evaluating and ranking proposals received from the short-listed Contractors. Preconstruction contract negotiations will ensue with the Contractor having the highest ranked proposal. Pending successful contract negotiations and Billings City Council approval, the Contractor will join the project team consisting of the City of Billings and HDR Engineering. During the preconstruction phase, the Contractor will work as an integral part of the project team to evaluate and further develop the preliminary design, assisting the Engineer and City in identifying opportunities for improvement and offering alternative solutions. The Contractor will develop cost estimates and offer suggestions with respect to means, methods, materials innovations and construction sequencing. During the construction phase, the Contractor will provide the necessary resources and subcontractors to implement the team's design and construct the project. Throughout the entire process, the objective is to maintain a spirit of cooperation and open communication so that project goals and objectives are clearly understood, potential problems are promptly resolved, and upon completion, the project is deemed a success by all. The Contractor or other key personnel cannot team with other partners to submit more than one SOQ. Only one SOQ per Contractor is acceptable, and City receipt of multiple SOQs from a Contractor will disqualify the Contractor. The City of Billings reserves the right to reject any or all SOQs if determined to be in the best interest of the City. The City of Billings is an Equal Opportunity Employer. Contractors interested in submitting SOQs may contact the City of Billings to receive the SOQ Instructions and any addenda that may be issued. For any questions contact: Randy Straus, PE City of Billings Public Works Department Engineering Division 2224 Montana Avenue Billings, MT 59101 Phone: (406) 657-8301, Fax: (406) 237-6291 Email: strausr@billingsmt.gov

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents