Last Updated | 04/25/2023 08:22 AM |
Project Title | GRP 111-23-7135-3 |
Physical Address | View project details and contacts |
City, State (County) | Pittsburgh, PA 15212 (Allegheny County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $8,422,222 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The description and location of the project is as follows: For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of 36,650.00 linear feet (6.941 miles) as indicated on the approved drawings included in the bid package for Group Project 111-23-7135-3 in Allegheny County, Marshall, Pine & Richland Townships, Commonwealth of Pennsylvania. This project being situated as follows: SR 0910, Section A50 (Wexford Bayne Road-Gibsonia Road) - From a point approximately 700 feet west of the SR 910/Mingo Road intersection at Segment 0010/0011 Offset 0655/0655 (Station 15+00.00) to a point approximately 200 feet east of the SR 910/Hardt Road intersection at Segment 0160 Offset 0175 (Station 383+50.00). Various State Routes and Facilities throughout Allegheny County for unforeseen repair and/or resurfacing, as directed. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays 408 Version: 2020-5 PennDOT - GRP 111-23-7135-3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated NTP: 05/08/2023 Required Completion: 04/02/2025 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |