Similar Projects
Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895
Infrastructure
Conception
$305,800 est. value
Asbury, IA 52002

Municipal Water Well Improvements Rebid
Infrastructure
Design
$1,131,320 CJ est. value
Dayton, IA 50530

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Design
$6,150,000 CJ est. value
Sioux City, IA 51104

High School Entrance Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 192,000 SF
Bidding
$3,000,000 CJ est. value
Orange City, IA 51041

2022 ADA Pedestrian Ramp Sidewalk Project
Infrastructure
Bidding
$25,000 CJ est. value
Charles City, IA 50616

Pavement Markings
Infrastructure
Sub-Bidding
$125,000 CJ est. value
Audubon, IA 50025

Lead-Based Paint Hazard Control Program Project
Term Contract, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Mason City, IA 50401

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

2022 Water Main Improvements
Infrastructure
Post-Bid
$300,000 est. value
Grundy Center, IA

Fir Avenue Sanitary Sewer and Water Main Extension
Infrastructure
Results
$77,300 est. value
Red Oak, IA

Hiawatha Turtle Creek Park Phase 2
Infrastructure
Results
Hiawatha, IA

East 14th Street Warehouse Distribution Center
New Construction, Infrastructure - 1,050,260 SF
Pending Verification
$114,000,000 CJ est. value
Des Moines, IA 50309

Schools Expansion and Renovation - IKM-Manning Community School District
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$19,950,000 CJ est. value
Manning, IA 51455

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 est. value
Urbandale, IA 50322

Last Updated 08/03/2022 08:03 PM
Project Title

Sanitary Sewer Rehabilitation - 2022

Physical Address View project details and contacts
City, State (County) Houghton, IA 52631   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $214,101 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Approximate quantities and items of work include furnishing and installing all materials and doing all work to Line all Clay sewers including: Mobilization. Traffic Control: most work is in yards and street right of way or public easement. Manhole Chimney Seal; Rubber Manhole Lining; IN-Situ Concrete Adjustment of Manhole height with concrete adjusting rings Manhole Casting & Lids as normally included in a sewer REHAB project. All work is to be done in compliance with the drawings and specifications prepared by Warner Engineering Associates Inc., Mount Pleasant, Iowa, which are now on file for public examination at the ENGINEER'S office and the City Clerk's office in HOUGHTON, IA. Each bid shall be made on a form furnished by the ENGINEER and accompanied by a bidder's bond with corporate surety satisfactory to the governing body, a check drawn on and certified by an Iowa bank or a U.S. chartered bank, or a certified share draft drawn on an Iowa credit union, and filed in a sealed envelope separate from the one containing the bid and in an amount equal to ten percent (10%) of the amount of the bid, made payable to the City of HOUGHTON, Iowa, and may be cashed by the City of HOUGHTON, Iowa as liquidated damages in the event the successful Bidder fails to enter into a contract within ten (10) days after award of the Contract and post bond satisfactory to the City of HOUGHTON insuring the faithful performance of the Contract. The bid security of the lowest three Bidders may be retained for a period of not to exceed sixty (60) days until a contract is awarded or rejection made. Other bonds or checks shall be returned after tabulation of bids. Payment to the CONTRACTOR for completed work on this project shall be made by the City of HOUGHTON, Iowa in cash from such funds as may be legally used for said purposes. This project is funded by a combination of City Cash on hand and Clean Water State Revolving Fund loans issued by the Iowa Department of Natural Resources. Payment to the CONTRACTOR shall be made monthly on estimates equivalent to ninety-five percent (95%) of the Contract value of the work completed since the last payment. Estimates shall be prepared prior to the Council meeting by the ENGINEER, who shall forward to the HOUGHTON City Clerk for payment each signed estimate before the next meeting of the City Council. Payment shall be made to the CONTRACTOR by the City Clerk within ten (10) days of approval by the Council. Final payment of the remaining five percent (5%) shall be made not less than thirty-one (31) days after completion and acceptance by resolution of the City Council of the completed contract, assuming that no unpaid claims remain on file, and subject to the conditions and provisions of Chapter 573 of the Code of Iowa. The CONTRACTOR shall comply with the Equal Employment Opportunity requirements of Executive Order 11246, Affirmative Action requirements, MBE/WBE/SBRA requirements and requirements to pay Federal Pre-determined Wages as outlined in the Contract Documents. The CONTRACTOR shall be able to demonstrate a "good faith" effort was made to utilize MBE/WBE/SBRA businesses in this project. This PROJECT is subject to the "Buy-American" provisions. The successful Bidder shall be required to furnish a Performance and Payment Bond in an amount equal to one hundred percent (100%) of the Contract price, said bonds to be issued by a responsible surety approved by the City Council and shall guarantee faithful performance of the Contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City of HOUGHTON, Iowa from the claims and damages of any kind caused by the operation of the CONTRACTOR, and shall guarantee maintenance of the improvements for a period of two (2) years from and after its completion and Final Acceptance by the City Council. If the contract is awarded by the Council on July 19th, 2022, the SANITARY SEWER REHAB - 2022 shall be fully completed on or before May 31, 2023. If the contract award is delayed by the Council, the date for completion of the SANITARY SEWER REHAB - 2022 shall be extended by a time equal to the delay in award of a contract. A Notice to Proceed shall be issued the same day as execution of the Agreement by the City. The Bidder agrees to pay as liquidated damages the sum of $500 for each consecutive calendar day after the Contract completion date that the project is not fully completed.If the contract is awarded by the Council on July 19th, 2022, the SANITARY SEWER REHAB - 2022 shall be fully completed on or before May 31, 2023. If the contract award is delayed by the Council, the date for completion of the SANITARY SEWER REHAB - 2022 shall be extended by a time equal to the delay in award of a contract. A Notice to Proceed shall be issued the same day as execution of the Agreement by the City. The Bidder agrees to pay as liquidated damages the sum of $500 for each consecutive calendar day after the Contract completion date that the project is not fully completed. Drawings and specifications governing the construction of the proposed improvements have been prepared by Warner Engineering Associates Inc., Mount Pleasant, Iowa. Said drawings and specifications and prior proceedings of the City Council of HOUGHTON referring to and defining said improvements are hereby made a part of this Notice and the proposed Contract by reference, and the proposed Contract shall be executed in compliance therewith. The PROJECT Documents may be obtained from Warner Engineering Associates Inc., 1010 East Washington St., Suite 202; Mount Pleasant, Iowa 52641. No deposit is required but all PROJECT Documents shall be returned in good condition. By virtue of statutory authority, preference shall be given products and provisions grown and coal produced in the State of Iowa and to Iowa domestic labor to the extent lawfully required by Iowa Statutes, providing that the award of the Contract will be to the lowest responsible bidder complying with this Notice and the Instructions to Bidders. The City Council reserves the right to reject any or all bids and to waive technicalities and irregularities. Administrative rule 875-156.3 requires that "when awarding a contract for a public improvement to the lowest responsible bidder, the public body shall allow a preference to a resident bidder as against a nonresident bidder that is equal to any preference given or required by the home state or foreign country in which the nonresident bidder is a resident without regard to whether such preferences are actually enforced by the applicable regulatory body in each state." Published by order of the City Council of Houghton, Iowa.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents