Similar Projects
Loop 363 and Mclane Parkway 18 Water Line Improvements - City of Temple
Alteration
Conception
$1,200,000 est. value
Temple, TX

2021 Bond - Temple Independent School District
New Construction, Infrastructure
Conception
$184,900,000 CJ est. value
Temple, TX 76501

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

Lake Belton High School - Belton Independent School District
New Construction, Infrastructure
Design
$125,600,000 CJ est. value
Temple, TX 76504

Circle K #2709048 / Rockport
New Construction, Infrastructure - 5,200 SF
Bidding
$5,500,000 CJ est. value
Rockport, TX 78382

Sanitary Sewer Improvements and Street Reconstruction
Infrastructure
Bidding
$330,000 CJ est. value
Diboll, TX 75941

HSH Surgical Ambulatory Regional Centers
Infrastructure, Build-out - 8,031 SF
Post-Bid
$1,500,000 CJ est. value
Lufkin, TX 75904

Hammerhead Barracks 9400 Block Renovations
LEED Certification, Infrastructure, Renovation
Post-Bid
$188,237,500 CJ est. value
Fort Hood, TX 76544

Battalion Headquarters Building with Classrooms
New Construction, Infrastructure
Results
$10,159,966 CJ est. value
Killeen, TX 76540

Battalion Headquarters Building with Classrooms
New Construction, Infrastructure
Results
$10,159,966 CJ est. value
Killeen, TX 76540

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Apache Drive Sidewalk Improvements - City of Temple
Infrastructure
Pending Verification
$413,167 CJ est. value
Temple, TX 76504

Iglesia Cristiana Church / Killeen
New Construction, Infrastructure - 10,000 SF
Pending Verification
$500,000 CJ est. value
Killeen, TX 76541

Area at Ave E and Ave H (Ferguson Park District) - City of Temple
Infrastructure
Conception
$1,300,000 CJ est. value
Temple, TX 76501

Last Updated 10/04/2023 05:07 AM
Project Title

Brookeland Fresh Water Supply District FY2020 Forest Hills Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Jasper, TX 75951   (Jasper County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

It is the Intent and Purpose of These Contract Documents to Provide for Improvements to the Existing Sanitary Sewer Collection System. Contractor to Perform All Work as Indicated. This Project Will Be Funded by Twdb. This Contract Shall Provide for the Necessary Labor, Equipment, Tools, Materials, and All Other Related Construction for the Proposed Project. SUMMARY OF WORK The Contractor shall rehabilitate approximately 12,947 linear feet of 6 inch diameter sanitary sewer line by pipe bursting with 8 inch DR-11 (Class 160) HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall rehabilitate approximately 7,264 linear feet of 8 inch diameter sanitary sewer line by pipe bursting with 10 inch DR-11 (Class 160) HDPE, all in accordance with the plans and specifications. The Contractor shall provide all bypass pumping as directed by the Engineer. The Contractor shall remove and replace 43 manholes as shown on plans and per details. The Contractor shall install 2 new manholes as shown on plans and per details. The Contractor shall remove all existing 6 inch sanitary sewer cleanouts and install a new 48 inch fiberglass manhole at the end of the line, all in accordance with the plans and specifications. The Contractor shall conduct pre and post installation TV inspection of the sewer lines, all in accordance with the plans and specifications. Each proposal shall be accompanied by a bid guarantee of not less than 5% of the total bid amount, as a guarantee that the bidder will enter into a contract and execute the required bonds within ten days after notice of award. The successful bidder must furnish Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner. For additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract, please consult TWDB All questions regarding Davis-Bacon guidance can be directed to: U.S. Department of Labor Wage and Hour Division1-866-4USWAGE (1-866-487-9243), TTY: 1-877-889-5627, Monday-Friday 8 a.m. to 8 p.m. Eastern Time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents