Similar Projects
Demolish the Building at 74 Pierce Street
Demolition
Bidding
Lewiston, ME 04240

118 Bedford Street Demolition Project
Demolition
Bidding
Portland, ME 04102

115 South Street Demolition Project
Demolition
Post-Bid
Farmington, ME 04938

Modular Structure Removal
Post-Bid
Kittery, ME

Dublin Road Site Cleanup and Building Demolition Project at 371 Dublin Road
Demolition
Results
Owls Head, ME

Demolition of 921 Middle Road
Demolition
Results
Sabattus, ME

Westpoint Stevens Boiler House
Demolition
Construction
Biddeford, ME

128 School Street Demolition Project
Demolition
Bidding
Gorham, ME 04038

112 Maguire Street Demolition
Demolition
Post-Bid
Farmington, ME 04938

Demolition/Removal of One Building Unit and Any Additions/Located at 113 Leighton Road
Demolition
Results
Augusta, ME 04330

Demolition and Removal of the 12 Proulx Court Building
Demolition
Bidding
Sanford, ME 04083

Demolition of a House
Demolition
Post-Bid
Caribou, ME

Building Demolition at 28 Arsenal Street
Demolition
Results
Augusta, ME

Building Demolition at Tidewater Farm
Demolition
Post-Bid
Falmouth, ME 04105

Mt. Ararat High School - Abatement and Demolition
Demolition
Results
$300,000 to $1,500,000 est. value
Topsham, ME 04086

Reported 01/09/2020 12:00 AM
Project Title

Dismantle, Transport, and Disposal of a Submarine Support Facility (SSF)

Physical Address View project details and contacts
City, State (County) Kittery, ME 03904   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Request for Information as defined in FAR 15.201(e). The Portsmouth Naval Shipyard (PNSY) is conducting market research to identify potential sources that possess the capability to dismantle, transport, and dispose of at an approved off-site facility, A Submarine Support Facility (SSF) at the Portsmouth Naval Shipyard, Kittery ME. The SSF is radiologically controlled. Disposal will be at an approved offsite facility. The contractor will be expected to maintain accountability for all materials at the worksite during demolition. PNSY expects that the materials will be controlled and disposed of as radioactive waste for bulk waste assay or an equivalent count and release process. All contract personnel will be subject to Shipyard exposure monitoring. PNSY contemplates using the demolition and bulk disposal method, commonly referred to as “Rip and Ship.” The volume of waste estimated for disposition is approximately 1,600,000 pounds. PNSY will perform waste stream characterizations and all radiological surveys in conjunction with this project. The successful offeror must hold all qualifications, certifications, and licenses necessary for performance of this requirement, including the transportation to, and disposal at an approved off-site facility.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents