Similar Projects
Water Well 3 Repair
Infrastructure
Bidding
$250,000 CJ est. value
Clovis, NM 88103

Plumbing Services
Alteration
Post-Bid
Las Vegas, NM

Retrofit District Facilities with Automatic Faucets
Alteration
Post-Bid
Gallup, NM

Mechanical, Electrical, and Plumbing Job Order Contract
Term Contract
Results
Clovis, NM

Plumbing - On-Demand Construction and Maintenance District Wide Services
Term Contract
Results
Gallup, NM

On Call Plumbing Services
Alteration
Post-Bid
Alamogordo, NM

Deming Access Road
Infrastructure
Results
$1,874,094 CJ est. value
Las Cruces, NM 88001

Providing Plumbing Services on an as Needed Basis
Alteration
Post-Bid
Pecos, NM

Replace Residential Water Service Valves - Morgan Site
Renovation
Results
$25,781 CJ est. value
Gallup, NM 87301

Plumbing Specialties
Alteration
Post-Bid
Santa Fe, NM

Alto De Las Flores Mdwca Water Improvements - Solar Array
Infrastructure
Results
$105,694 CJ est. value
Alta Vista, NM 87701

Plumbing and HVAC Services District 2 and Surrounding Areas
Alteration
Post-Bid
Roswell, NM

On-Call Plumbing Services and Repairs
Term Contract
Post-Bid
Santa Fe, NM 87501

Taos Pueblo Housing Authority Na-Tehsieme Sustainable Development
Infrastructure
Post-Bid
$3,500,000 CJ est. value
Taos, NM 87571

Water Sub Metering
Infrastructure
Post-Bid
$600,000 CJ est. value
Albuquerque, NM 87102

Last Updated 07/13/2023 01:02 PM
Project Title

Union del Llano MDWCA Water System Improvements Phase 3

Physical Address View project details and contacts
City, State (County) Llano, NM 87579   (Taos County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,108,088 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 13, 2023, this project has not yet been awarded. A timeline for award has not yet been established. This project consists of the installation of 5,720 linear feet of new 6" PVC and 5,710 linear feet of 4" PVC waterline in a common trench, approximately 940 linear feet of new 3" PVC drain line, a new pressure reducing valve, construction of a new 70,000 gallon welded steel water storage tank, tank access road, tank site piping, tank site grading, including a new retaining wall, connection to existing waterline, installation of water meters, and appurtenances, and the installation of a new electrical and controls for the Llano San Juan and Cuchilla wells. This project also includes the rehabilitation of the community's wells and replacement of the plumbing manifold at the Llano San Juan Well

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents