Similar Projects
Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

New Fire Station 3 - City of Raleigh
New Construction, Infrastructure - 11,749 SF
Design
$11,500,000 CJ est. value
Raleigh, NC 27601

Sewer Pump Station No. 1 Improvements
Post-Bid
$524,959 est. value
Walnut Creek, NC 27534

Wren Family Estates - Sitework
New Construction - 12,618 SF
Post-Bid
Siler City, NC 27344

Progressive Design-Build Services for Pipeline Projects
Results
NC

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

Red Springs High School Athletic Complex
Construction
$3,000,000 to $4,000,000 est. value
Red Springs, NC 28377

Waterstone Medical Office Building Site Package
New Construction
Construction
Hillsborough, NC 27278

Grove Park
New Construction, Infrastructure
Design
$12,131,000 CJ est. value
Clemmons, NC 27012

Stallings Road Water Improvements 2020
Post-Bid
Monroe, NC

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

Chair Road Waterline Extension
New Construction
Construction
$500,000 est. value
Castle Hayne, NC 28429

Montlieu Avenue Roadway and Utility Improvements
Post-Bid
High Point, NC 27260

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

The Shoppes of Madison Place
New Construction - 22,054 SF
Construction
$1,573,600 est. value
Charlotte, NC 28273

Last Updated 08/31/2022 01:01 PM
Project Title

2019 Clean Water State Revolving Fund Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Sharpsburg, NC 27803   (Nash County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,367,195 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 31,2022, this project has not yet been awarded. A timeline for award has not yet been established. The Project includes the following Work: Restore the remote monitoring of nine municipal wastewater pump stations. Replace the existing vacuum assist pumps with submersible pumps at seven of the Town's nine wastewater pump stations. Extend an existing 6-inch force main on Railroad Street 580 LF to a new discharge location. Raise or seal manhole tops for 22 manholes. CCTV inspect 14,300 LF of gravity sewer. Provide the following work in the Brickyard Pump Station service area: Provide up to 20 point repairs to gravity sewer main lines. Cap up to 136 services in the Weaver MHP and adjacent MHP in the Brickyard PS service area. For information regarding this project please contact: Todd Tripp The East Group 324 Evans Street, Greenville, NC 27858 Phone: 252-758-3746 Email: todd.tripp@eastgroup.com Payment can be made by either: 1.Credit Card 2.Check made payable to Duncan-Parnell - mail check to: 4275 Regency Dr #100, Greensboro, NC 27410. Printing will not begin until the check is received 3.Duncan-Parnell Account Purchase of entire bid set includes all plans and specifications, including any addenda released at time of order. Planholders will be notified by email when future addenda are issued and it will be the responsibility of each plan holder to download the addenda. Shipping, if required, will be charged to each order.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents