Similar Projects
Last Updated | 07/20/2022 11:28 PM |
Project Title | Solar Thermal Heat Exchange Tank Liner, Exchange Coils and Pump Replacement and Solar Thermal Panels (16) and Piping Removal and Replacement of September Roof Project |
Physical Address | View project details and contacts |
City, State (County) | Washburn, WI 54891 (Bayfield County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Electric, Pumps and Wells, Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $40,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The existing solar thermal system was commissioned in May 2009 on the Jail. It is comprised of 16, 4'x10' collectors with a total area of 640 ft2. producing 2345 therms annually. The system reduces natural gas fired domestic hot water heating avoiding 13.7 tons of CO2/year from being emitted into the atmosphere. Included in the system is a storage tank that has an EDPM liner and 4 copper coil heat exchangers. The system needs a replacement tank liner, replacement heat exchangers and a new recirculating pump. (Contractor to confirm tank size). Proposals Timing: 1. Panel removal/relocation: by no later than, August 31, 2022 in preparation for roof installation in September. 2. Hot water Tank liner, 4 exchange coils, recirculation pump replacement and tank cleanup. 3. Panel Reinstall and system operating by November 11, 2022, after roof is complete. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |