Similar Projects
Solar Electric - Police East District
Alteration
Conception
$480,000 est. value
Madison, WI 53716

Solar Electric - Electric Vehicle Charging @ Engineering Services Building
Term Contract
Conception
Madison, WI 53713

Upgrade Building 112 Power Project - Clement J. Zablocki VA Medical Center
Renovation
Design
$1,000,000 to $2,000,000 est. value
West Milwaukee, WI 53214

Solis Circle Roof Replacement
Alteration
Bidding
$125,000 est. value
Altoona, WI 54720

Underground Utilities Installation - MEP
Infrastructure, Alteration
Bidding
$1,500,000 est. value
Madison, WI 53704

Forest County Potawatomi Community 200 kW Solar Photovoltaic Energy System
Post-Bid
Crandon, WI

Well Station No. 5 HMO Treatment Facility & Building Modifications
Post-Bid
$2,907,000 est. value
Pewaukee, WI 53072

Bayfield County Fairgrounds Phase 3 Electrical Power Distribution Improvement
Results
WI

Brewster Village Roof Replacement Phase 1
Results
Appleton, WI 54914

Solar Electric - Pinney Library
Alteration
Conception
Madison, WI 53714

Small Electric Motor Equipment Repair
Alteration
Bidding
$40,000 est. value
Milwaukee, WI

Courthouse Complex T & M
Term Contract
Post-Bid
Milwaukee, WI 53233

Electrical Controls and Breaker Replacement
Results
Less than $1,400,000 est. value
Black River Falls, WI 54615

Substation Transformer
Alteration
Bidding
Sun Prairie, WI

56--MFB-Roof Replacement (NWHC)
Post-Bid
Madison, WI

Last Updated 07/20/2022 11:28 PM
Project Title

Solar Thermal Heat Exchange Tank Liner, Exchange Coils and Pump Replacement and Solar Thermal Panels (16) and Piping Removal and Replacement of September Roof Project

Physical Address View project details and contacts
City, State (County) Washburn, WI 54891   (Bayfield County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Pumps and Wells, Roofing
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing solar thermal system was commissioned in May 2009 on the Jail. It is comprised of 16, 4'x10' collectors with a total area of 640 ft2. producing 2345 therms annually. The system reduces natural gas fired domestic hot water heating avoiding 13.7 tons of CO2/year from being emitted into the atmosphere. Included in the system is a storage tank that has an EDPM liner and 4 copper coil heat exchangers. The system needs a replacement tank liner, replacement heat exchangers and a new recirculating pump. (Contractor to confirm tank size). Proposals Timing: 1. Panel removal/relocation: by no later than, August 31, 2022 in preparation for roof installation in September. 2. Hot water Tank liner, 4 exchange coils, recirculation pump replacement and tank cleanup. 3. Panel Reinstall and system operating by November 11, 2022, after roof is complete.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents