Similar Projects
Water Supply Well Production Well 2A
Bidding
Dexter, GA

Well #27 Rehabilitation and Upgrade
Bidding
Albany, GA 31546

Contract A - Well and Chemical Feed Building
Post-Bid
Fort Valley, GA 31030

One Portable Diesel Pump
Post-Bid
Valdosta, GA 31603

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Wastewater Flow Measurement Stations
Results
Covington, GA 30016

Well Maintenance
Term Contract
Post-Bid
Savannah, GA 31401

Primary Chill Water Pumps Replacement
Results
Savannah, GA

Wet Well Cleaning and Disposal
Term Contract
Post-Bid
Gainesville, GA 30501

12v 1-1/2 Submersible Water Pump Department of Public Works
Results
GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

Water Source Heat Pump Replacements for Columbus Public Library
Results
Less than $1,444,293 est. value
Columbus, GA 31906

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Modifications to Well 110
Results
Dawsonville, GA 30534

Deep Well and Chemical Feed Building
Post-Bid
Less than $600,000 est. value
Pavo, GA 31778

Last Updated 04/28/2021 11:03 AM
Project Title

Bypass Pump Station And Force Main Alternate Route

Physical Address View project details and contacts
City, State (County) GA   (Emanuel County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Division One: Force Main Construction of approximately 14,780 L.F. of 10-inch PVC and 1,222 L.F. of 10-inch ductile iron force main, 520 L.F. 16-inch steel casing by jack and bore, 13 combination vacuum and air release valve manholes with appurtenances and storm water monitoring. Time allotted for this work is 180 consecutive calendar days for substantial completion and 210 days for final completion. Division Two: Sewage Pump Station Construction of one (1) duplex raw sewage pump station and corrosion inhibitor system including site work, wetwell, piping, fencing, access drive, electrical, pumps, painting, and all appurtenances. Time allotted for this work is 240 consecutive calendar days for substantial completion and 270 days for final completion.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents