Similar Projects
Hurricane and Storm Damage Risk Reduction
Term Contract
Design
$5,000,000 to $10,000,000 est. value

Police Facilities Maintenance and Improvements - City of Shreveport
New Construction, Renovation, Infrastructure
Design
$12,500,000 CJ est. value
Shreveport, LA 71107

Public Works Maintenance Building
New Construction, Infrastructure
Bidding
$846,686 CJ est. value
Shreveport, LA 71107

LA 3094: Hearne Ave Bridge Interim Repair
Infrastructure
Bidding
$250,000 CJ est. value
Shreveport, LA 71103

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Water oak Drainage
Alteration
Post-Bid
$17,140 est. value
Slidell, LA 70458

St. Vincent Avenue Drainage Improvements
Infrastructure
Results
$89,000 est. value
Shreveport, LA 71150

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Results
$10,000,000 est. value

American Electric Power / Shreveport
New Construction, Infrastructure - 80,000 SF
Construction
$77,450,000 CJ est. value
Shreveport, LA 71119

Caliber Collision / Shreveport
New Construction, Infrastructure - 16,100 SF
Pending Verification
$3,654,700 CJ est. value
Shreveport, LA 71115

Toussant on Market
New Construction, Infrastructure - 77,400 SF
Pending Verification
$56,347,776 CJ est. value
Shreveport, LA 71107

Wallace Lake Road Office
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Shreveport, LA 71106

RFP D/B - Expand Dialysis Center
Addition, Demolition, Renovation, Infrastructure
Bidding
$250,000 CJ est. value
Shreveport, LA 71101

RFQ Engineering - 2022 Roadway and Drainage Improvements
Infrastructure
Post-Bid
$750,000 CJ est. value
Shreveport, LA 71107

M/V New Roads - 2021 Uscg Drydock
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Last Updated 01/17/2023 07:07 AM
Project Title

12 Mile Bayou, Shreveport, Louisiana, P.L. 84-99 Emergency Bank Stabilization, West Agurs Levee Sta. 196+90 and 427+10

Physical Address View project details and contacts
City, State (County) Shreveport, LA 71107   (Caddo County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,475,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Jan 12, 2023 Contract Award Number: W912EE23C0004 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: XLDNW4GXP8F3 Contractor Awarded Name: TESTAMENT LLC Contractor Awarded Address: Shreveport, LA 71105-5650 USA Base and All Options Value (Total Contract Value): $2475000.00 DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, and constructing the bank stabilization on the Red River in Shreveport, Caddo Parish, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, demolition of existing timber pile dikes, R200 Stone - longitudinal stone dike, stone bank paving, and environmental protection. Plans and specifications will be available on the Sam Web Page at https://sam.gov. Bidders may register on the Interested Vendor's List (IVL) at https://sam.gov and retrieve an IVL from the same location. Hardcopies will not be available. Bidders are encouraged to check often for changes (AMENDMENTS) to posted solicitations ISSUE DATE ON OR ABOUT: 22 JUL 2022. BID OPENING DATE AND TIME ON OR ABOUT: 23 AUG 2022 @ 2:00 P.M. CST. THIS PROCUREMENT IS A TOTAL SMALL BUSINESS SETASIDE. IT IS ISSUED UNDER NAICS 237990, FSC CODE YIPZ, FOR A FIRM FIXED PRICE CONTRACT. The estimated value of the proposed work is between $1,000,000 and $5,000,000. All technical inquiries and questions relating to this solicitation are to be Submitted via bidder inquiry in project at http://www.Projnet.Org/project. See Page entitled technical inquiries and questions *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall begin performance within 10 calendar days and complete it within 110 calendar days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents