Similar Projects
Plumbing Services
Alteration
Post-Bid
Salt Lake City, UT

HVAC and Plumbing
Term Contract
Post-Bid

Salt Lake Airport On-Call Plumbing Services
Alteration
Results
$25,000 to $150,000 est. value
Salt Lake City, UT

DFCM Construction Pre-Qualified Mechanical - Snow College Business Bldg Plumbing Upgrades
Alteration
Results
$218,000 est. value
Ephraim, UT 84627

New Construction of Residential Building - Plumbing
Alteration
Post-Bid
Blanding, UT 84511

UDC Plumbing Services
Alteration
Results
Ogden, UT 84401

Sand Filter Replacement with Defender Units
Alteration
Post-Bid
Saint George, UT 84770

Peterson Heritage Center Waste Water Piping Replacement
Alteration
Results
$510,000 est. value
Salt Lake City, UT 84112

Plumbing Fixtures
Term Contract
Post-Bid
Salt Lake City, UT

Division of Juvenile Justice Services Millcreek Youth Detention Center Shower/Plumbing Fixture Upgrade
Alteration
Results
$329,291 est. value
Ogden, UT 84404

HVAC and Plumbing Services
Alteration
Post-Bid
Salt Lake City, UT

12200 South Sewer Upsizing Project
Infrastructure
Results
$2,832,000 CJ est. value
Draper, UT 84020

Mechanical, Plumbing, and Electrical Systems at Pleasant Creek School
Alteration
Post-Bid
$200,000 est. value
Mount Pleasant, UT 84647

Town of Garden City South Well
Infrastructure
Post-Bid
$650,000 CJ est. value
Garden City, UT 84028

Bathtub and Counter Refinishing
Term Contract
Post-Bid
Salt Lake City, UT

Last Updated 12/30/2022 06:31 PM
Project Title

20A: 3500 South to 4100 South Redwood Road Sewer

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84129   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $12,552,242 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises the installation of approximately 8,000 Linear Feet of new 12-inch, 15 inch, 18-inch, and 24-inch sewer mains, installation of manholes, reconnection of sewer lateral services, restoration of asphalt, concrete sidewalks, curb and gutter, and landscaping impacted by construction activities. Work is located in UDOT and West Valley City rightof-way and will affect the following roads: 3500 South, 1950 West, and Redwood Road. Projects includes replacement of approximately 8,700 LF of sewer line in Redwood Road between 3500 South and 4100 South and in 3500 S between Decker Lake Drive and Redwood Road in West Valley City Granger-Hunter Improvement District (District) requests Contractor Pre-qualification Proposals for the construction of the 20A: 3100 South to 4100 South Redwood Road Sewer Project. Bids will only be accepted from those Contractors that are pre-qualified by the OWNER. No other Contractors will be eligible to bid on this Project. The Work of this Contract includes constructing approximately 8,700 LF 12-inch to 24-inch sewer in Redwood Road (UDOT right-of-way) between 3500 South and 4100 South and in 3500 South between Decker Lake Drive and Redwood Road located in West Valley City, Utah Question Submission Close Date 11/2/2022 5:00 PM MDT All questions about the Project must be submitted in writing via U3P . Site Location 3500 South - UDOT ROW 1950 West - WVC ROW 3800 South - WVC ROW Redwood Road - UDOT ROW

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents