Similar Projects
Eastern Band of Cherokee Indians Masterplan
Renovation, Addition
Conception
Cherokee, NC 28719

Emilia's Acrobatics, Gymnastics and Cheerleading
Renovation - 20,000 SF
Design
Hendersonville, NC

YMCA and Housing
New Construction - 93,336 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28209

Renovations to Girls Batting Facility West Brunswick High School
Renovation
Post-Bid
Brunswick, NC 28479

Multipurpose Indoor Sports Complex Project Funding
Post-Bid
NC

Fetzer Gym Renovations
Results
Chapel Hill, NC 27514

Catawba River Soccer Complex Phase III
Results
Morganton, NC 28655

Qubein Arena
New Construction
Construction
$100,000,000 est. value
High Point, NC

Westchester Country Day School
New Construction, Renovation - 50,481 SF
Construction
High Point, NC 27265

Calvert Sports Academy and Development Center
New Construction - 272,044 SF
Pending Verification
$10,000,000 CJ est. value
Holly Springs, NC

Turf Field and Parking
New Construction
Design
Huntersville, NC 28078

Renovation of the Ayden Arts and Recreation Gymnasium
Renovation
Post-Bid
Ayden, NC 28513

W R Anderson Gym Renovation
Results
$225,000 est. value
Winston-Salem, NC 27107

Harding University H.S. Addition and Renovation
Renovation, Addition
Construction
Charlotte, NC 28208

Field House
New Construction
Design
Huntersville, NC 28078

Last Updated 01/14/2020 11:52 AM
Project Title

Southern Wayne HS Competition Gymnasium

Physical Address View project details and contacts
City, State (County) Dudley, NC   (Wayne County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method
Project Status Construction Commenced October 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project base bid consists of a 25,708 sq. ft. competition gymnasium with locker rooms, concessions and group toilets. Construction will be poured in place concrete floor slab, metal studs and brick exterior walls, CMU corridors, metal roof trusses and metal roofing. Exterior materials include brick veneer, mechanically fastened membrane roof and raised seam metal roof. Interior materials include wood athletic flooring, resilient athletic flooring, VCT floor tiles, ceramic tile in toilet areas, telescoping bleachers, painted gypsum walls and acoustical lay-in ceilings. There will be an Alternate #1 for a six (6) classroom building addition and an Alternate #2 for an aluminum canopy connecting the new six-classroom building to the existing building.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents