Similar Projects
The Obama Presidential Center - Bid Packages 05-043 & 05-055
New Construction - 5,000 SF
Design
$910,000 to $1,170,000 est. value
Chicago, IL 60637

Library Expansion
Renovation, Addition - 28,000 SF
Design
Mahomet, IL

Loading Dock Upgrades
Renovation
Bidding
$400,000 CJ est. value
Springfield, IL 62703

Improvements at the Shorewood-Troy Public Library
Renovation
Bidding
$60,000 CJ est. value
Shorewood, IL 60404

Rockford Public Library
New Construction
Post-Bid
$33,000,000 est. value
Rockford, IL 61101

New Helen Plum Public Library
New Construction
Post-Bid
Lombard, IL

New Study Rooms
Results
Glendale Heights, IL

Hillsboro Public Library
Renovation
Results
Hillsboro, IL 62049

The Obama Presidential Center
New Construction - 5,000 SF
Construction
$700,000,000 to $830,000,000 est. value
Chicago, IL 60637

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

Imani Senior Village
New Construction, Infrastructure - 78,000 SF
Pending Verification
$22,000,000 CJ est. value
Chicago, IL 60628

Team Pioneros
Renovation, Addition - 64,317 SF
Pending Verification
$53,900,000 est. value
Chicago, IL 60639

Public Library Building Construction
New Construction
Design
$5,000,000 est. value
Vandalia, IL

Westchester Public Library Interior Renovation
Renovation
Bidding
$400,000 CJ est. value
Westchester, IL 60154

The Obama Presidential Center - Bid Packages 8.24.21
New Construction - 5,000 SF
Post-Bid
$13,950,000 to $20,433,000 est. value
Chicago, IL 60637

Last Updated 09/20/2022 06:34 AM
Project Title

The Studio Construction: Bid Package #2 Glazing and Bid Package #3 Millwork

Physical Address View project details and contacts
City, State (County) Champaign, IL 61820   (Champaign County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Champaign Public Library seeks to complete an interior renovation converting a lower-level storage space into a new 8000 sf teen area including a new level 1 communicating stair. The Library will remain open and maintain a workable schedule to minimize public and staff inconvenience. ALL questions pertaining to this Bid must be submitted in writing at least five (5) business days prior to the deadline for submission to: Addie Domasica Project Executive F.H. Paschen (773) 444-1472 adomasica@fhpaschen.com Bidders shall submit with each bid a bid bond reflecting TEN PERCENT (10%) of the total bid amount in the form contained in the bid documents. The bond shall be secured by a certified check, letter of credit, bank draft, bank cashier's check or surety licensed to do business in the State of Illinois. The bond shall be payable without condition to the Champaign Public Library for the same amount. Bid security deposited by the successful bidder shall be retained or drawn on as liquidated damages in the event that bidder fails to deliver fully executed contract documents, performance security, or certificates of insurance to the Champaign Public Library within fourteen (14) calendar days from the date the Champaign Public Library sends the Notice of Award to that bidder. By submission of the bid, the bidder acknowledges the impracticability of calculating actual damages which would be suffered by the Library and agrees that the full amount of the bid bond represents reasonable liquidated damages. The successful bidder will be required to furnish a Payment and Performance Bond in an amount equal to one hundred percent (100%) of the total contract amount within fourteen (14) days of the Notice of Award. The bond shall be secured by a certified check, letter of credit, bank draft, bank cashier's check or surety licensed to do business in the State of Illinois and made payable to the Champaign Public Library A workforce participation goal of 20% MBE and 15% WBE. Workforce participation goals refer to the percentage of minority and female individuals employed on a project. The Champaign Public Library, reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the Library. The criteria for selection of the lowest responsible bidder are set forth in Section 12.5-38 of the Champaign Municipal Code, 1985, as amended and the bid documents.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents