Similar Projects
Cleaning Of Manholes Sewer Lines and Drains
Infrastructure
Bidding
$100,000 est. value
Marietta, GA

Spencefield Drainage Box Improvements IV
Infrastructure
Bidding
Moultrie, GA

Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

Dewater Quarry
Post-Bid
Auburn, GA 30011

Smith Street Drainage Improvements
Results
Hagan, GA 30429

Glen Emerald Lake Dam Repair
Results
GA

Tally Green Pond Improvements
Renovation
Construction
Marietta, GA 30068

Spot Road Pump Station And Gravity Sewer
New Construction, Infrastructure
Bidding
Cumming, GA 30040

Concrete Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30501

5280 North Powers Ferry Road Phase 1 Streambank Repair and Culvert Replacement Project
Results
Sandy Springs, GA 30328

3808 Laurel Drive Drainage Improvements
Infrastructure
Bidding
Acworth, GA 30101

Construction of the Lamb Loop Street and Drainage Improvements to Serve the CCBCI Distribution Center
Post-Bid
Less than $725,000 est. value
Tifton, GA 31793

Whitfield Street Drainage Improvements
Results
Smyrna, GA

Leachate Lift Station Upgrade to Serve the Tower Road Landfill
Infrastructure
Bidding
GA

West Main Street Draingage Improvements
Post-Bid
Statesboro, GA

Reported 10/12/2021 12:00 AM
Project Title

Rehabilitation of the Rosedale Dam for Storm Water Retention

Physical Address View project details and contacts
City, State (County) Augusta, GA 30909   (Richmond County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Perform Rehabilitation of the Rosedale Dam for Storm Water Retention: Rosedale Dam will be reconstructed and modified with a reinforced concrete box culvert through the dam to provide normal flows into the creek bed. The Dam construction will include a concrete spillway and outlet works. The crest and downstream slope will be protected by a new concrete spillway. The entire structure will require clearing, grubbing, reshaping of the earthen embankments, compaction, riprap placement, and establishment of vegetative cover.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Base Courses, Aggregate Base Courses, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents