Similar Projects
SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Conception
$735,000 est. value
Toppenish, WA 98948

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Conception
$677,000 est. value
Sunnyside, WA 98944

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Construction of the Transportation Cooperative
New Construction, Infrastructure
Post-Bid
$7,570,000 CJ est. value
Selah, WA 98942

West Ahtanum Road Resurfacing
Infrastructure
Post-Bid
Union Gap, WA 98903

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Cleman's View Park - Park and Ride
Infrastructure, Alteration
Results
$413,060 est. value
Naches, WA 98937

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

US 12/Eschbach Rd - Intersection Safety Improvements
Infrastructure
Conception
$672,000 est. value
Yakima, WA 98908

SR 823/E Naches Ave to N Wenas Rd Wye - ADA Compliance
Alteration
Design
$301,000 est. value
Selah, WA 98942

Wapato Headworks Rehabilitation
Infrastructure
Bidding
$3,000,000 CJ est. value
Wapato, WA 98951

Last Updated 09/12/2022 10:24 AM
Project Title

Wallace Way Business Park -West Entrance Road

Physical Address View project details and contacts
City, State (County) Grandview, WA 98930   (Yakima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,391,907 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 12, 2022, project was awarded to Culbert Construction, Inc, awarded amount is $1,391,907.30.** This project consists of constructing approximately 800 LF of new roadway including cement concrete curb and gutter, sidewalks, and driveways, HMA paving, partial illumination system, and public utilities. Work includes constructing water main and service stubs, water valves, and fire hydrant assemblies, installation of storm drain piping and structures, and utility conduits. In addition, the work involves constructing sanitary sewer main and service stubs, sanitary sewer manholes, hydroseeding and related work in accordance with the Technical Specifications, Drawings, and Contract Documents. Wallace Way Business Park off of Wallace Way and Forsell Roads in Grandview, Washington. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashiers check, or surety bond in an amount equal to of the amount of such bid proposal. Should the successful Bidder fail to enter into such contract and furnish satisfactory performance bond or quality assurance submittals within the time stated in the contract documents, the bid proposal deposit shall be forfeited to the Port of Grandview. Each Bidder shall warrant that he has not entered into collusion with another bidder or any other person, and does not discriminate in any manner against any person based solely on race, color, sex, or creed. Estimated Range-$750,000 and $1.25 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents