Similar Projects
Construction Engineering Services for Eureka Road (Toledo Road to Ford/M-85)
Infrastructure
Conception
$1,000,000 CJ est. value
Taylor, MI 48180

Tireman Road and Greenfield Road - 30-420 - Dearborn
Infrastructure
Conception
$500,000 CJ est. value
Dearborn, MI 48126

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

North Service Center Pumping Station Improvements - Great Lakes Water Authority
Demolition, Renovation, Infrastructure
Post-Bid
$72,216,000 CJ est. value
West Bloomfield, MI 48323

Senior Center Parking Lot Replacement
Infrastructure
Results
$176,520 CJ est. value
Rockwood, MI 48173

Helen Street Demolition and Excavation
Infrastructure
Results
Detroit, MI 48211

Pinnacle Race Course Redevelopment
New Construction
Construction
Huron Township, MI 48164

Remove and Replace Sidewalks
Infrastructure
Construction
$200,000 CJ est. value
Highland Park, MI 48203

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Oakwood District Intercommunity Relief Sewer Modification at Oakwood District - 222001 - Great Lakes Water Authority
Infrastructure
Conception
$47,392,000 CJ est. value
Detroit, MI 48226

Shareef Site Condominium
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Canton, MI 48188

Bid Package 7 - Stottlemyer Early Childhood Center Playground Upgrades, Hoover School Site Upgrades, Wayne Memorial High School Pavement Replacement
Renovation, Infrastructure
Post-Bid
Wayne, Westland, MI 48185

Last Updated 03/15/2023 12:33 PM
Project Title

Jay Kay Industrial Building

Physical Address View project details and contacts
City, State (County) Romulus, MI 48174   (Wayne County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for industrial warehouse building on 7.10 acres. As of March 15, 2023, this project is on hold with site plan approvals. A general contractor has not yet been selected. A construction timeline has not been determined.

Details

1 Story Above Grade, 70,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents