Similar Projects
Walmart Supercenter #144-244 - SMART BUNDLE
Renovation - 217,969 SF
Design
Fayetteville, AR 72704

AutoZone #5023
New Construction
Design
Tontitown, AR 72762

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Walmart Neighborhood Market #2742-214 - SPRB-R
Renovation - 40,257 SF
Post-Bid
Springdale, AR

Walmart Supercenter #54-240 - Entertainment Optimization
Renovation - 18,441 SF
Construction
Springdale, AR 72764

Walmart Supercenter #4108-249 - D9 Gun Removal
Renovation - 185,992 SF
Construction
$8,429 est. value
Springdale, AR

Rogers Warehouse Development
New Construction
Pending Verification
Springdale, AR

Mixed Use Development
New Construction
Pending Verification
Springdale, AR 72766

Ulta Beauty at Target #1470
Renovation - 1,000 SF
Design
Fayetteville, AR 72703

Brough Commons Retail Shops Renovation
Renovation, Alteration - 13,650 SF
Post-Bid
$5,600,000 est. value
Fayetteville, AR

Walmart Supercenter #359-263 - CSP
Renovation - 218,466 SF
Construction
$372,147 est. value
Fayetteville, AR 72703

Stage Station Commercial Buiding
New Construction - 4,080 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fayetteville, AR 72703

Chandler Crossing
New Construction
Design
Fayetteville, AR 72703

Aaron's Rental
Renovation - 9,214 SF
Post-Bid
Fayetteville, AR 72703

Walmart Supercenter #4108-247 - SPRB-R
Renovation - 91 SF
Construction
$1,707,218 est. value
Springdale, AR 72762

Reported 06/29/2022 11:41 AM
Project Title

Mountain View Avenue Retail Development

Physical Address View project details and contacts
City, State (County) Springdale, AR 72764   (Washington County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of June 28, 2022 the project is in planning stage and seeking rezoning approval from the City of Springdale. A meeting was held June 7, 2022, but the results are not yet available. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before year end 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Retail, 1 Story Above Grade, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents