Similar Projects
Sanibel Causeway Shoreline Stabilization Island B
Bidding
Fort Myers, FL

Sanibel Shoreline Stabilization and Improvements Island A and B CEI Services
Bidding
FL

Maintenance of Stormwater Ponds and Flow Ways
Post-Bid
Fort Myers, FL 33913

Maddox Lane Sidewalk and Drainage Project
Post-Bid
Bonita Springs, FL 34135

Drainage Improvements
Results
Less than $863,048 est. value
FL

Lake Bank Improvements - LK59, LK83, LK91, LK93, LK101, LK103, and LK123
Results
Fort Myers, FL

Goodwin Street Pedestrian and Drainage Improvements
Bidding
Bonita Springs, FL

Iona Drainage District Canal H-7 Drainage, Phase 1
Term Contract
Results
Fort Myers, FL 33901

Captiva Island Beach Renourishment Project
Bidding
Captiva, FL

Pipe Inspection, Cleaning, Repair and Ditch Pavement Repair
Results
Less than $396,215 est. value
FL

Shoreline Stabilization Project at Turner Beach Park
Results
Less than $500,000 est. value
Captiva, FL 33924

Bonita Drive Pathway and Drainage Project
Results
Bonita Springs, FL 34135

Countywide Minor Paving, Drainage and Concrete Improvements
Term Contract
Results
Fort Myers, FL 33901

Pine Lake Preserve Re-Hydration Project
Results
Bonita Springs, FL

Caloosahatchee Canal Rehab L-3
Results
Fort Myers, FL

Last Updated 02/06/2020 09:52 AM
Project Title

Sanibel-Captiva Road Shore Protection

Physical Address View project details and contacts
City, State (County) Sanibel, FL 33957   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of construction of a cantilevered seawall and a concrete cap, construction of a revetment, and replacement of the existing guardrail. The Project includes temporary excavation of the existing grade for construction access and relocation of rock on the existing revetment. The seawall will consist of either steel sheetpile or Truline vinyl and concrete composite, pending selection by owner.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents