Similar Projects
SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Goshen Township Road 74 Resurfacing Project
Infrastructure
Post-Bid
Goshen, OH

Water Main Replacement 2023 Project Bundle 3
Alteration
Post-Bid
Cincinnati, OH

Fire Hydrant Flow Testing
Results
Cincinnati, OH

Redevelopment of Hollister Development Site
Infrastructure
Results
Cincinnati, OH

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

AutoZone #3637 / Loveland
New Construction, Infrastructure - 6,500 SF
Design
$1,300,000 CJ est. value
Loveland, OH 45140

2023 Road Resurfacing Program
Infrastructure
Bidding
$6,438,705 CJ est. value
Batavia, OH 45103

Goshen Township Fire Station
Infrastructure
Post-Bid
$492,671 est. value
Milford, OH 45150

Charles Snider Road Widening
Infrastructure
Results
$166,498 est. value
Goshen, OH

Nestle Purina Wet Food Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Union Township, OH 45103

Last Updated 02/17/2023 11:35 PM
Project Title

Business 28 Sidewalk and Water Main, Cook Road Sidewalk

Physical Address View project details and contacts
City, State (County) Milford, OH 45150   (Clermont County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,286,315 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installing sidewalk, storm sewer, and water main on the south side of Business 28 from 967 SR 28 to Highview Drive as well as sidewalk and storm sewer on the west side of Cook Rd from Business 28 to Newberry Ave. Substantial Completion Date: July 24, 2023 Project Funding: CDBG Final Completion Date July 31, 2023 Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Email Project Manager, (Troy A. Niese), (tan@choiceoneengineering.com). If no response within 24 hours call (513-239-8554).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents