Similar Projects
Fuel Tank Replacement - MLK - F-000835 - City of Houston
Infrastructure
Conception
$323,000 est. value
Houston, TX 77033

Avalon Place - Paving - N-210019 - City of Houston
Infrastructure
Conception
$6,604,000 est. value
Houston, TX 77019

Mass Grading in Paradise Farms
Infrastructure
Design
$2,000,000 CJ est. value
Spring, TX 77373

Proposed Paving and Bridge to Serve Barrett Crossing Street Dedication Section One
New Construction, Infrastructure
Design
$1,683,972 CJ est. value
Houston, TX 77002

RFQ D/B - Design-Build Services For Remain Overnight (RON) Aircraft Parking at George Bush Intercontinental Airport (IAH)
Infrastructure
Bidding
Houston, TX 77032

RFQ D/B - Design-Build Services For Remain Overnight (RON) Aircraft Parking at George Bush Intercontinental Airport (IAH)
Infrastructure
Bidding
Houston, TX 77032

Pipe, PVC, Schedule 80 Various Sizes
Post-Bid
Houston, TX

Storm Sewer, Sanitary Sewer and Water Lines to Serve Morton Creek Ranch Sections 24 and 26
Infrastructure
Post-Bid
TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Booster Pump Replacement
Results

Raising Cane's #942 / Deer Park
Infrastructure, Renovation - 3,170 SF
Pending Verification
$1,500,000 CJ est. value
Deer Park, TX 77536

Raising Cane's #942 / Deer Park
Infrastructure, Renovation - 3,170 SF
Pending Verification
$1,500,000 CJ est. value
Deer Park, TX 77536

WHCRWA Surface Water Supply Project Contract S3-B1
Infrastructure
Design
$150,000 est. value
Houston, TX 77042

Shaw Road Lift Station
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Cypress, TX 77429

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

Last Updated 08/16/2022 02:33 PM
Project Title

Harris County MUD No. 171, Water Well No. 5

Physical Address View project details and contacts
City, State (County) Houston, TX 77042   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,678,200 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2022, construction is underway. Work to include but not limited to supply, construction, installation and testing of Water Well No. 5 and associated piping and fittings, electrical building, foundations, grading, storm sewer piping and inlet, paving, fencing, yard piping, generator, complete electrical system on site, and modifications to Water Plant No. 1 Bids received after the closing time will be returned unopened. The deadline to ask questions is 3/04/2022 10:00 AM A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids. Please read the new Special Conditions of the Agreement Part A and be prepared to comply with same. Contractor is required to submit TEC Form 1295 (Certificate of Interested Parties) with their bid. If plans, specifications and bid documents are not initially available for download, they will be available for review at the office of the Engineer. If you do not receive the calendar invite because you are not a formal plan holder please email aarzu@bgeinc.com or Lhoward@bgeinc.com and they will have the invite forwarded to you no later than 2 hours before the bid opening. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents