Similar Projects
Twin Hills Water Main Improvements Project
Infrastructure
Bidding
$938,000 est. value
Streetsboro, OH

Water System Improvements Phase II
Infrastructure
Post-Bid
$549,000 est. value
Windham, OH

Emergency and Specialized Construction Services
Term Contract
Post-Bid
OH

Spot Safety - D04 POR IR-76 RA Parking Lots
Results
OH

Garfield Road Water Main Replacement
Results
Hiram, OH

Kent Campus ADA Improvements
Infrastructure
Post-Bid
$320,000 est. value
Kent, OH

South Street Water Main Replacement
Results
Garrettsville, OH

Contractor - Ohio ARNG Camp James A. Garfield Joint Military Training Site Item Trail Phase 5
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Ravenna, OH 44266

Mill/Diamond Street Resurfacing - Contract 2021 - A
Results
$412,000 est. value
Ravenna, OH

Haven Water and Sewer Improvement Project
Results
Less than $285,000 est. value
Ravenna, OH 44266

Hillcrest, Zeta, Spruce Water Line Project
Infrastructure
Results
$499,114 est. value
Ravenna, OH

Parta - Driver Training Pad
Infrastructure
Results
$487,000 est. value
Kent, OH

Freedom Township ADA Project
Infrastructure
Results
Ravenna, Windham, OH 44266

Meridian Street Parking Lot Improvements
Infrastructure
Results
$122,332 est. value
Ravenna, OH

Riddle and Chestnut Resurfacing
Infrastructure
Results
$582,000 est. value
Ravenna, OH

Last Updated 06/13/2022 02:48 AM
Project Title

Rayann Parkway Improvements

Physical Address View project details and contacts
City, State (County) Ravenna, OH   (Portage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,085,043 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rayann Parkway Improvements - Contract 2022 - F" the Proposed Work Under This Contract Consists of the Construction of 1,100 Feet of Industrial Roadway Which Ends in a Cul-de-sac for Chestnut Commerce Park. The Work Includes a New Storm Sewer System and Sidewalk and Waterline Extension.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents