Similar Projects
Superstition Fuel Tank Replacement and Drainage Improvements - CP1005 - City of Mesa
Infrastructure
Conception
$3,007,019 est. value
Mesa, AZ

South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

Broadstone At The Grand Phase II
New Construction, Infrastructure
Design
$109,000,000 est. value
Tempe, AZ 85281

Papago Plaza - Sprouts
New Construction, Infrastructure - 23,453 SF
Design
$4,000,000 est. value
Scottsdale, AZ 85257

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Renovation
Bidding
Phoenix, AZ 85009

Tonto NF Road Sign Installation
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Scottsdale, AZ 85262

Fencing Replacement and Repair
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Peoria, AZ 85345

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

The Homestead at Lehi Crossing
New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Mesa, AZ 85213

Last Updated 07/22/2022 04:33 PM
Project Title

Paradise Ridge Drainage Improvements

Physical Address View project details and contacts
City, State (County) Goodyear, AZ 85338   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $30,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Flood Control District of Maricopa County (District) extends an invitation to interested and qualified firms or individuals to submit formal sealed qualifications electronically through an outside agent, Periscope S2G, to provide Construction Manager at Risk (CMAR) design phase services and construction phase services as described herein. The Paradise Ridge Drainage Improvement Project will provide for the construction of new channels, basins and associated features to contain the 100-year flood within the Rawhide Wash corridor. The Project limits are from Scottsdale Road to SR-101. This is a complex project and, as such, the DISTRICT will obtain valuable constructability input during the design effort through delivery of pre-construction services under this Contract FCD2022C029. The Project Partners are the City of Phoenix and the District. The pre-construction budget range is approximately $500,000.00 The estimate total cost of the Phase 2 construction is $30,000,000.00 Q & A deadline: Jun 24, 2022 8:00:00 PM EDT

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents