Similar Projects
Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells
Alteration
Design
Alton, IL 62002

Water System Improvements Division 1 Well Building and Aerator Replacement
Infrastructure
Bidding
Macon, IL

Pump Replacements at Chain of Rocks Pump Station
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Granite City, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Well 3 Water Main Reconfiguration
Infrastructure
Bidding
Monee, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

New Water Supply Well No. 13
Renovation
Results
Less than $400,000 est. value
La Salle, IL 61301

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Screw Pump Installation
Results
Less than $75,000 est. value
Granite City, IL 62040

Procurement Services Office
Post-Bid
Naperville, IL

Concrete Repair and Epoxy Coating of Wet Wells and Screen Channels
Results
Less than $840,000 est. value
Gurnee, IL 60031

Well 6 Repairs
Post-Bid
Antioch, IL

Last Updated 04/12/2022 11:36 AM
Project Title

Well No. 22 Reservoir Repairs

Physical Address View project details and contacts
City, State (County) Rockford, IL   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Structural repairs within the Well No. 22 reservoir including replacing and temporary shoring structural supports around the well casing and replacement of a ladder.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 05 - Metals, Metal Fabrications.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Ponds and Reservoirs.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents