Similar Projects
Last Updated | 04/18/2022 01:43 PM |
Project Title | New Railhead Loading Facility, Fort Drum, NY |
Physical Address | View project details and contacts |
City, State (County) | Fort Drum, NY (Jefferson County) |
Category(s) | Transportation |
Sub-Category(s) | Railroad/Subway |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $15,000,000 to $35,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of a new Railhead Loading Facility: New railhead loading area and facilities with concrete ramps, container side loading area, and rail operations storage building. Supporting facilities shall include an Alert Holding Area with concrete marshalling area and a cargo inspection facility with weigh-in-motion scales, container handling storage/repair facility with container staging area, overhead lighting, electric, water, sewer, and gas utilities services, parking lot, railhead support, concrete truck loading ramps, fencing, fence gates, and information systems communication lines. The contractor shall be responsible to understand the operational performance of the railhead facility including circulation pattern, ramps, staging, building operations, and storage requirements; and the existing tracks must remain uninterrupted throughout project duration, except for scheduled shutdowns during repairs and infrastructure installations. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |