Similar Projects
Last Updated | 03/29/2023 12:33 AM |
Project Title | Malone CSD - 2021 Capital Project Phase 2 Contract No. 03 - Mechanical Contractor (MC) |
Physical Address | View project details and contacts |
City, State (County) | Malone, NY 12953 (Franklin County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,172,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Board of Education of the Glens Falls City School District invites the submission of Separate Sealed Bid Proposals to furnish materials and labor to complete the 2021 Capital Project Phase 2 -Glens Falls Middle/High School project all in accordance with the plans and specifications for the following categories of work: 2021 Capital Project - Phase 2 - Middle/High School - Electrical Construction Any bid may be withdrawn without prejudice prior to the official bid opening time or any publicized postponement thereof. Any bid received after the time and date stated above will be returned to the bidder unopened. The bidding documents may be examined, free of charge, at the office of MOSAIC ASSOCIATES ARCHITECTS, The Frear Building, 2 Third Street, Suite 440, Troy, New York 12180, telephone (518) 479-4000 Addenda: All bid addenda will be transmitted to registered plan holders via email and will be available electronically. Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Each Bidder shall prepare their bid proposal, along with a bid security, in accordance with the terms and subject to the conditions set forth in the "Information for Bidders". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contracts. No bidder may withdraw their bid within 45 days after the date of the actual bid opening. The Board of Education reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after the bid opening Bidders can inspect the work locations before submitting bids. This can be done any Monday through Friday, except holidays, during hours when there will be School District Staff Personnel in the building. Unless directed otherwise, immediately upon entering the building, report to the School Office. This page of the specification may be used to identify you as a bidder. Follow instructions of School Personnel and keep interruptions to teaching activities to a minimum. SCOPE: The Work consists of the following, but not limited to: 1. Middle/ High School; Alterations and Reconstruction work to these areas: Main Office Suite, Nurse's Suite, Guidance Suite, Science Rooms, LGI 21st Century space and Maker Space/Esports Classroom, Corridors, Stairwells, Art display, and Toilet Rooms. Infrastructure replacement including window and shade replacement, exterior and interior door replacement, heating unit upgrades, flooring replacement, ceiling replacement, LED lighting upgrades and masonry cleaning. MC Range $900K to $1.15M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SED Control No. 16-15-01-06-0-001-016 SED Control No. 16-15-01-06-0-011-008 SED Control No. 16-15-01-06-0-017-012 SED Control No. 16-15-01-06-0-018-006 SED Control No. 16-15-01-06-0-018-008 SED Control No. 16-15-01-06-0-019-021 |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |