Similar Projects
West Cherry Street in Jesup - TIA
Infrastructure
Design
$700,000 CJ est. value
Jesup, GA 31545

West Cherry Street in Jesup - TIA
Infrastructure
Design
$700,000 CJ est. value
Jesup, GA 31545

Coy Cox Road Improvements
Infrastructure
Bidding
$921,500 CJ est. value
Omega, GA 31775

Coy Cox Road Improvements
Infrastructure
Bidding
$921,500 CJ est. value
Omega, GA 31775

Vegetation Removal Services
Term Contract
Sub-Bidding
Thomaston, GA 30286

Repair and Resurfacing of Exercise Walking Track
Infrastructure
Post-Bid
Harrison, GA 31035

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

2021 Milling and Deep Patching
Results
Monroe, GA

Augusta Regional Airport Rehabilitate Air Carrier And General Aviation Apron Phase IV
Results
Augusta, GA 30903

Roper Corporation Manufacturing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$118,000,000 CJ est. value
LaFayette, GA 30728

Roper Corporation Manufacturing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$118,000,000 CJ est. value
LaFayette, GA 30728

FY22 LMIG for Roadway Resurfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Tifton, GA 31794

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

T32-D4-Pavepres-SR 41 Randolph MM 6-10-117570
Results
GA

Oglethorpe County New K-5 School
New Construction, Infrastructure - 145,000 SF
Bidding
$35,000,000 CJ est. value
Lexington, GA 30648

Last Updated 08/12/2022 08:07 AM
Project Title

Haley Drive Road Resurfacing Bid

Physical Address View project details and contacts
City, State (County) Leesburg, GA 31763   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $289,893 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 11, 2022, project was awarded to Oxford Construction Company, awarded amount is $289,893.15. The Lee County Board of Commissioners is accepting sealed written bids from qualified contractors for road resurfacing services for Haley Drive. This road will be patched and resurfaced from Lovers Lane Road to Old Leesburg Road (S.R. 133), which is approximately 1.47 miles. The project is to include approximately 98.9 TONS of 4" deep base patching by milling existing road and replacing with 4" of 19mm Superpave Asphalt, milling 350 SF of pavement flat, and 1,900 tons of 9.5 mm Superpave Asphalt resurfacing at 165 lbs/sy. Project will also include 2.05 miles of high build fog lines, 1.47 miles of high build centerline (replaced in-kind), paving turn lanes along Lovers Lane Road and shoulder grading the full road after completion.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents