Similar Projects
Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Kay Beller Park to BNSF Loop Trail - City of Whitefish
New Construction, Infrastructure, Renovation
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure - 27,000 SF
Design
$12,000,000 CJ est. value
Kalispell, MT 59901

ADA Sidewalk Ramp Repairs - General Maintenance
Infrastructure
Bidding
$290,000 CJ est. value
Columbia Falls, MT 59912

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Spokane Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Whitefish, MT 59937

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Three Rivers Bank
New Construction, Infrastructure - 6,300 SF
Pending Verification
$1,000,000 CJ est. value
Whitefish, MT 59937

Rose Crossing West Improvements
Infrastructure
Conception
$2,347,071 CJ est. value
Kalispell, MT 59901

East 2nd Street Hotel
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Whitefish, MT 59937

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

Last Updated 03/30/2023 10:28 AM
Project Title

Hilltop Sewer Main Replacement and Lift Station 5 Rehabilitation

Physical Address View project details and contacts
City, State (County) Columbia Falls, MT 59912   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $806,245 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Hilltop Sewer Main Replacement Installation of approximately 1,644 lineal feet of 12-inch diameter gravity sewer main, re-paving Grace and Beth Road (from south of intersection of 13th Street West with Grace Road to south intersection of Beth Road and Martha Road), placement of crushed base from intersection of Beth Road and Martha Road to intersection of Beth Road and Bethany Road, and replacement of disturbed landscape from the end of Beth Road to Talbot Road (through Horine Park) following installation of the sanitary sewer gravity main and service line connections. Lift Station 5 Rehabilitation Replacement of the Lift Station 5 submersible pumps with new submersible pumps, replacement of force main piping, new valve vault with associated valves and piping, and appurtenances necessary for a complete system CONTRACTOR(s) and any of the CONTRACTOR's subcontractors bidding on this project will be required to obtain registration with the Montana Department of Labor and Industry (DLI). CONTRACTOR's are required to have registered with the DLI prior to bidding on this project. All laborers and mechanics employed by CONTRACTOR(s) or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of the State of Montana in accordance with the schedule of Montana Prevailing Wage Rates established by the Montana Department of Labor and Industry included in the Project Manual. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to City of Columbia Falls, in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Construction Performance Bond and a Construction (Labor and Materials) Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. No bid may be withdrawn after the scheduled time for the public opening of the Bids specified above. The right is reserved to reject any or all Proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60), and to accept the lowest responsive and responsible bid which is in the best interest of the City of Columbia Falls. The CONTRACTOR(s) is required to be an Equal Opportunity Employer.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents